结合国道316线安全隐患整治一期工程石潭溪大桥主桥墩深水桩基施工全过程中所遇到的多种难题,简要介绍水下桩基础在复杂工程地质施工中,通过水上作业平台设计、辅助机械选择、桩基成孔清孔工艺改进、长距离泵送水下混凝土灌注等关键施工技术对桩基施工质量及进度的积极影响。
Combining with various difficulties encountered in the construction of deep-water pile foundation of main pier of Shitanxi Bridge in the first phase of the safety hidden danger regulation project of National Highway 316,this paper briefly introduces the underwater pile foundation in complex engineering geological construction through the design of water operation platform,the selection of auxiliary machinery,the improvement of pile foundation hole-forming and hole-clearing technology,and long distance pumping underwater. Concrete grouting and other key construction technologies have a positive impact on the quality and progress of pile foundation construction.
引文
[1]王峻高.国道316线安全隐患整治一期工程施工图纸[Z].湖南:湖南建筑设计院,2013.
[2]王厚广.浅谈公路桥梁施工技术[J].中国城市经济,2011,14(4):168-169.
[3]徐维钧.桩基施工手册[M].北京:人民交通出版社,2007.
[4]冯耀宗.关于桥梁桩基施工技术的探讨[J].交通环保,2015,36(1):22-28.
[5]李中,黄荻.桥梁桩基施工关键技术研究[J].山西建筑,2014,35(2):317-318.
[6]汪鑫,徐世平.桥梁桩基施工质量控制措施[J].科技创新与应用,2012,2(6):131-132.
[7]王海生.桥梁桩基施工的成孔工艺研究[J].科技资讯,2014,12(29):45,47.