CSP生产模式下轧制计划编制模型及算法
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Model and algorithm for rolling scheduling of compact strip production
  • 作者:张启敏 ; 唐秋华 ; 郑鹏 ; 毛永年 ; 王春锋
  • 英文作者:Zhang Qimin;Tang Qiuhua;Zheng Peng;Mao Yongnian;Wang Chunfeng;College of Machinery and Automation,Wuhan University of Science and Technology;General Rod Product Plant,Wuhan Iron and Steel Co.,Ltd.;
  • 关键词:连铸连轧 ; 轧制计划 ; CSP ; 启发式规则 ; 变邻域搜索
  • 英文关键词:continuous casting and rolling;;rolling schedule;;CSP;;heuristic rule;;variable neighborhood search
  • 中文刊名:YEKJ
  • 英文刊名:Journal of Wuhan University of Science and Technology
  • 机构:武汉科技大学机械自动化学院;武汉钢铁股份有限公司条材总厂;
  • 出版日期:2016-01-19 11:00
  • 出版单位:武汉科技大学学报
  • 年:2016
  • 期:v.39;No.166
  • 基金:国家自然科学基金资助项目(51275366;51305311);; 高等学校博士学科点专项科研基金课题(博导类;20134219110002);; 中国博士后科学基金资助项目(2013M542073)
  • 语种:中文;
  • 页:YEKJ201601005
  • 页数:6
  • CN:01
  • ISSN:42-1608/N
  • 分类号:26-31
摘要
针对紧凑式带钢生产(CSP)模式下的轧制计划编制问题,综合考虑设备能力、订单需求和相邻板坯间厚度跳跃,提出一种两阶段问题求解框架。第一阶段以最小化轧制单元数和非计划卷使用量为目标建立整数规划模型,为保证模型的求解效率,从生产实际中提炼出"优先薄板,后补非计划材"的启发式规则进行求解。第二阶段以最小化板坯间平均厚度跳跃为目标来建模,综合考虑非计划卷厚度可变的特性,提出一种多邻域结构的变邻域搜索算法进行求解。通过某CSP生产线的轧制计划编制实例验证了该模型和算法的有效性。
        Aiming at the rolling scheduling problem in a compact strip production(CSP)plant,this paper provides a two-stage solution framework which takes into account the equipment capacity,the order requirement and the thickness variation between adjacent slabs.In the first stage,an integer programming model is proposed to minimize the numbers of rolling units and unplanned slabs simultaneously.To solve this model efficiently,a heuristic rule extracted from the production practice is employed so that thinner slab is entitled with higher priority and unplanned slab will be manufactured unless it is quite necessary.The model of the second stage is built to lower the thickness variation between adjacent slabs and is solved by a variable neighborhood search algorithm which considers the variable thickness values of unplanned slabs.Examples of rolling scheduling in a CSP plant testify the effectiveness of the proposed model and algorithm.
引文
[1]Tang Lixin,Liu Jiyin,Rong Aiying,et al.A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron&Steel Complex[J].European Journal of Operational Research,2000,124:267-282.
    [2]贾树晋,李维刚,杜斌.热轧轧制计划的多目标优化模型及算法[J].武汉科技大学学报,2015,38(1):16-22.
    [3]董广静,李铁克,王柏琳,等.考虑倒垛因素的轧制计划编制方法[J].控制与决策,2015,30(1):149-155.
    [4]邹宗华,李铁克.CSP生产线轧制计划模型及算法[J].冶金自动化,2003,27(2):18-22.
    [5]毛新平,高吉祥,柴毅忠.中国薄板坯连铸连轧技术的发展[J].钢铁,2014(7):49-60.
    [6]Mladenovi N,Hansen P.Variable neighborhood search[J].Comput Oper Res,1997,24(11):1097-1100.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700