改建铁路阳安二线洋县汉江特大桥采用(40+64+40)m单线预应力混凝土连续梁结构形式跨越京昆高速公路。该转体桥成功运用BIM技术,缩短了工期,节约了成本,取得了良好的经济和社会效益,本文结合BIM技术在此工程施工中的实际应用,来探索适合转体桥的BIM技术实施方案。为今后转体桥运用BIM技术提供借鉴。
The Yangxian Hanjiang Extra-bridge of Yangan No. 2 line of the reconstructed railway is constructed using the(40+64+40)m single-line prestressed concrete continuous beam structure across the Beijing-Kunming Expressway. The swivel bridge successfully used BIM technology, shortened the construction period, saved the cost, and achieved good economic and social benefits. This paper combines the practical application of BIM technology in the construction of this project to explore the implementation scheme of BIM technology suitable for swivel bridges, to provide reference for application of BIM technology in swivel bridge.