摘要
对郑州奥体中心体育馆屋盖网架累积滑移法施工技术的应用进行总结,系统阐述网架结构累积滑移法施工步骤。通过施工计算、模拟分析及施工监测的对比分析,印证滑移法施工的实施效果,对施工的成功经验进行总结,提出滑移施工的关键环节及控制要点。
This paper summarizes the application of cumulative sliding construction technology for the roof space truss of Zhengzhou Olympic Sports Center Stadium project,and systematically expounds the construction steps of cumulative sliding for space truss structure. Through the comparative analysis of construction calculation,simulation analysis and construction monitoring,the implementation effect of sliding construction is verified,the successful experience of construction is summarized,and the key links and control points of sliding construction are put forward.
引文
[1]张红福.大型焊接球网架同步控制滑移施工技术[J].低温建筑技术,2018,40(2):93-96.
[2]杨晓东,陆汉时.大跨度网架高空滑移分段组拼施工[J].建筑施工,2017,39(12):1767-1769.
[3]郭玉坤.南京南站大跨度屋盖网架高空滑移施工技术[J].铁道标准设计,2012(9):127-131.
[4]俞宝达,王旭峰,金人杰.高空滑移施工技术在网架中的应用[J].结构工程师,2006(3):92-94.
[5]刘小刚,戴耀军,林冰,等.南京南站屋面网架长距离高空滑移安装技术[J].施工技术,2011,40(23):8-12.
[6]王小波.钢结构施工过程健康监测技术研究与应用[D].杭州:浙江大学,2010.
[7]问晓洲,关超,沈海生.浅谈某体育馆钢结构屋面桁架滑移施工技术[J].江西建材,2016(19):82.
[8]罗尧治,孙旭光,沈雁彬,等.基于光纤光栅传感技术的网壳滑移法施工监测[C]//第十一届空间结构学术会议论文集,2005.