CCS电站输水隧洞TBM管片结构设计与生产
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Design and Practice of TBM Lining Segment in the Water Conveyance Tunnel of CCS Project
  • 作者:杨军义 ; 陈丹 ; 刘新云 ; 董甲甲
  • 英文作者:YANG Junyi;CHEN Dan;LIU Xinyun;DONG Jiajia;Yellow River Engineering Consulting Co., Ltd.;
  • 关键词:TBM ; 管片 ; 选型 ; 设计 ; 生产 ; CCS水电站
  • 英文关键词:TBM;;segment;;selection;;design;;production;;CCS Hydropower Station
  • 中文刊名:RMHH
  • 英文刊名:Yellow River
  • 机构:黄河勘测规划设计研究院有限公司;
  • 出版日期:2019-06-10
  • 出版单位:人民黄河
  • 年:2019
  • 期:v.41;No.406
  • 语种:中文;
  • 页:RMHH201906023
  • 页数:5
  • CN:06
  • ISSN:41-1128/TV
  • 分类号:103-106+110
摘要
对厄瓜多尔CCS水电站输水隧洞工程TBM管片的设计和生产过程进行总结,首先根据工程地质情况,综合考虑洞径、受力特征和施工难易程度对管片进行了选型;然后参照美国规范推荐的修正惯用法,采用有限元分析软件ANSYS对管片进行了结构受力分析和配筋计算;最后根据管片混凝土浇筑和养护过程的各种工艺,制定了管片生产全过程的技术要求及出厂验收技术标准。通过分析明确了管片选型的方法和结构的受力特征,总结了管片混凝土原材料检验、混凝土配制、混凝土振捣、混凝土养护和管片出厂检验等技术标准。
        In this paper, the design and production process of TBM segment of the water tunnel of CCS Hydro-Junction Project were summarized. Firstly, according to the engineering geological conditions, the segment selection was made considering the diameter of the tunnel, the stress characteristics and the construction difficulty. Then, referring to the modified routine method recommended by the American code, the structural stress analysis and reinforcement calculation of the segment were carried out by the finite element analysis software ANSYS. Finally, according to the various technologies of concrete casting and maintenance process, the technical requirements for the whole process of segment production and the technical standards for factory acceptance were formulated. The design and production process of TBM segment in CCS water control project were summarized by the paper, the mechanical characteristics of segment structure were defined, some technical standards such as raw material inspection, concrete preparation, concrete vibration, concrete maintenance and factory inspection of segment concrete were summarized.
引文
[1] 杨继华,景来红,李清波,等.TBM施工隧洞工程地质研究与实践[M].北京:中国水利水电出版社,2018:9-15.
    [2] 惠世前,金长文.CCS水电站大断面长隧洞双护盾TBM掘进技术[J].云南水力发电,2014,30(5):78-81.
    [3] 王美斋,肖豫,陈晓年,等.厄瓜多尔CCS水电站TBM引水隧洞左右通用型管片的设计与实践[J].资源环境与工程,2017,31(5):606-609.
    [4] 王美斋,董甲甲.TBM输水隧洞管片衬砌型式的设计研究与应用[J].水电与新能源,2017(7):20-22.
    [5] ACI Committee 318.Building Code Requirements for Structural Concrete and Commentary:ACI 318-08[S].Michigan:American Concrete Institute,2008:66-71.
    [6] 孙波,傅鹤林,张加兵.基于修正惯用法的水下盾构管片的内力分析[J].铁道科学与工程学报,2016,13(5):929-937.
    [7] US Army Corps of Engineers.Tunnels and Shafts in Rock:EM1110-2-2901[S].Washington:Department of the Army,1997:1-9.
    [8] 苏华友,汪家林.TBM施工中的质量控制与管理[J].岩石力学与工程学报,2004(11):1930-1934.