摘要
分析了明挖法隧道施工过程中对近接桥梁桩基的影响,并且从施工技术角度对降低影响的具体措施进行了详细阐述,旨在确保明挖法隧道施工顺利进行并且保持接近桥梁的良好应用情况。
This paper analyzed the influence on near bridge pile foundation during the open excavation method tunnel construction,and elaborated in detail the specific measures to reduce the influence from the point of view of construction technology,in order to ensure the smooth construction of open excavation tunnel and keep close to the good application situation of bridge and road.
引文
[1]张伯雨,左天芝.浅埋破碎软弱围岩明挖大断面隧道施工技术研究[J].工程建设与设计,2018(13):204-206.
[2]黄溜洋,金城.城市明挖隧道施工方法研究[J].科技风,2018(11):88.
[3]陶涛.明挖法隧道施工深基坑支撑的优化方案[J].黑龙江交通科技,2018(1):137,139.
[4]梅嬿婕.明挖地道上跨既有盾构隧道施工措施研究[J].山西建筑,2017,43(16):170-172.
[5]田川江,裴宗文.明挖暗埋隧道施工方案优化分析[J].工程建设与设计,2017(5):158-160.
[6]胡学兵,胡居义.明挖隧道上跨运营轨道隧道施工安全影响研究[J].地下空间与工程学报,2015(1):178-183,258.