针对2015年哈尔乌素露天煤矿采场运煤系统布置困难,采煤作业面滞后,内排紧张等造成采剥失衡的现状,提出将运煤系统更改至内排土场。对内排土场运煤系统的移设方案进一步优化分析,提出了征地制约影响下原煤运输系统移设方案,暂时缓解了坑下生产异常困难的局面。
According to stope coal transportation system layout difficulty, coal mining operation face delay, internal dumping tension situation in Haerwusu Open-pit Coal Mine, the article presents coal transportation system change into internal dump, and analyzes shift scheme of internal dump coal transportation system. The author presents the raw coal transportation system shift scheme under the affect of land acquisition, which temporarily alleviates the difficult situation of production under the pit.
引文
[1]李鑫,李翠平,李仲学,等.征地滞后对露天矿生产的影响与对策研究[J].中国煤炭,2011,37(11):22-25.
[2]马培忠,董宝弟,于正义,等.哈尔乌素露天煤矿初步设计说明书[Z].沈阳:中煤国际工程集团沈阳设计研究院,2004.
[3]周昌寿,杜竞中,郭增涛,等.露天矿边坡稳定[M].徐州:中国矿业大学出版社,1990.
[4]刘勇,车兆学,李志强,等,露天煤矿端帮残煤开采及边坡暴露时间分析[J].中国矿业大学学报,35(6):727-731.
[5]王运敏.陡帮开采临时非工作平盘宽度的研究[J].金属矿山,1993(3):4-9.
[6]颜杰,刘海建,陈志明,等.黑岱沟露天煤矿运输系统优化方案[J].露天采矿技术,2011(1):9-11.
[7]张占昌.黑岱沟露天煤矿运煤坑线优化的探讨[J].露天采矿技术,2006(s):15-17.
[8]王青,任凤玉,顾晓薇,等.采矿学[M].北京:冶金工业出版社,2011.
[9]李忠元,王洋,吴光玲,等.露天矿内部排土场案例分析[J].西部探探矿工程,2015,27(7):127-12.