厚大第四系含水层下矿体间柱回采工艺探讨
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Discussion on the Barrier Pillar Recovery Technology of the Orebody Intervening Pillars Under Large and Thick Quaternary System Aquifer Karst
  • 作者:生兆峰 ; 王磊 ; 郭伟
  • 英文作者:Sheng Zhaofeng;Wang Lei;Guo Wei;Huaibei Xulou Mining Co,Ltd.;Sinosteel Maanshan Institute of Mining Research Co.,Ltd.;State Key Laboratory of Safety and Health for Metal Mine;National Engineering Research Center of Huawei High Efficiency Cyclic Utilization of Metal Mineral Resources Co.,Ltd.;
  • 关键词:第四系 ; 二步骤回采 ; 间柱回采 ; 含水层
  • 英文关键词:Quaternary system,Two steps mining,Stoping of intervening pillars,Aquifer
  • 中文刊名:JSKS
  • 英文刊名:Metal Mine
  • 机构:淮北徐楼矿业有限公司;中钢集团马鞍山矿山研究院有限公司;金属矿山安全与健康国家重点实验室;华唯金属矿产资源高效循环利用国家工程研究中心有限公司;
  • 出版日期:2015-10-15
  • 出版单位:金属矿山
  • 年:2015
  • 期:No.473S
  • 语种:中文;
  • 页:JSKS2015S1007
  • 页数:4
  • CN:S1
  • ISSN:34-1055/TD
  • 分类号:28-31
摘要
厚大第四系含水层下矿体回采属于我国采矿行业长期面临的开采技术难题之一,尤其是目前厚大第四系含水层下二步骤矿柱回采相关的开采实践及指导理论均较少。采用常规的矿柱回采方案及思路已难以满足安全需求。以某矿山第四系含水层下二步骤间柱回采工艺为例,在掌握一步骤开采完成后的地压及水文等变化情况的基础上。通过前期采场稳定性理论研究获得开采尺寸,并提出多种开采方案。最后通过合理化利用现有采准工程,充填体内掘进巷道,辅以相关的地压控制措施等技术手段,最终选择安全可行,经济合理的回采方案。采取了针对性的安全技术措施。成功实现厚大第四系含水层下二步骤矿体安全回采的基础上,提出适合该类型矿柱的回采建议。
        Stoping of large and thick orebody under quaternary system aquifer is belongs to one of mining technology problem of the mining industry for a long time in our country.Especially the related mining practice and guidance theory of the two steps stoping of the pillars of the large and thick quaternary system aquifer are less.The two steps stoping method of the pillars of the large and thick quaternary system aquifer of a mine as the research example,based on mastering the pressure and hydrological changes situations after the completion of first step stoping,the mining size and variety of mining schemes are proposed by the early stage theory analysis of stope stability.Based on using the existing mining engineering,the roadway drivage filling body,supplemented by relevant pressure control technical measures,the feasible security stoping scheme is obtained,and the corresponding safety technical measures are taken.Based on the successful two steps stoping of the orebody under large and thick quaternary system aquifer,some suitable suggestions of the intervening pillars stoping are proposed.
引文
[1]胡永泉,叶振华,赵继银,等.厚大第四系下援倾科矿体采矿方孩的选择[J].金属矿山,2009(增刊):155-161.Hu Yongquan,Ye Zhenhua,Zhao Jiyin,et al.Selection of mining methods of little declining ore-body under thick-large quaternary[J].Metal Mine,2009(S):155-161.
    [2]刘道仁,孙翠华.近矿体帷幕注浆在矿山防治水的应用[J].中国矿山工程,2010,39(6):18-20.Lu Daoren,Sun Cuihua.Application of curtain grouting near orebody in mine water control project[J].China Mine Engineering,2010,39(6):18-20.
    [3]周欣,眭文武.充填体内反掘巷道在吴庄铁矿的应用[J].矿业工程,2013,11(4):27-28.Zhou Xin,Gui Wenwu.Application of reverse drive roadway in backfill body of Wuzhuang Iron Mine[J].Mining Engineering,2013,11(4):27-28.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700