某工程地下2层,地上8层,地下室和地上1, 2层为框架结构,地上3层以上为砖混结构。发生火灾后,根据鉴定报告严重烧伤区域的柱混凝土不满足原设计强度要求,需对火灾影响区域的主体结构进行加固设计,经采用拆除预制板卸载后再粘贴碳纤维加固梁和外粘型钢加固柱等措施,综合加固效果良好。
A project has 2 underground floors, 8 floors above ground, 1 and 2 floors in the basement and above ground, and a brick-concrete structure above 3 floors above ground. After the fire occurs,according to the identification report, the column concrete in the severely burned area does not meet the original design strength requirements. The main structure of the fire affected area needs to be reinforced.After the prefabricated plate is removed, the carbon fiber reinforced beam and the outer bonded steel reinforced column are attached. And other measures, the comprehensive reinforcement effect is good.
引文
[1]PEETERSB,DEROECKG. Reference-based Stochastic Subspace Identification for Output-only Modal Analysis[J]. Mechanical Systems and Signal Processing, 1999, 13(6):855–878.
[2]王元.火灾后混凝土结构质量评价与修复的研究[D].沈阳:东北大学, 2006.
[3]徐志武,何红霞,余峰.商业大楼火灾后的加固处理[J].建筑科学与工程学报, 2007, 24(1):17–25.
[4]靳飞,李国强.全盛期室内火灾参数化模型的参数随机性[J].建筑科学与工程学报, 2006, 23(4):44–48.
[5]马忠诚,吴波,欧进萍.全盛期隔间内火灾温度发展模型及其应用[J].哈尔滨建筑大学学报, 1998, 23(1):18–26.
[6]BRACCIMJ,LOBFR,REINHORNM A.Seismic Retrofot of Reinforced Concrete Structures Using Damping Devices[J].Proceedings of ATC-17-1 Seminar on seismic Isolation, Passive Energy Dissipation and Active Control, California, 1993:3–9.
[7]吴波,李洪泉,欧进萍.地震后有损伤结构的耗能减震加固设计[J].世界地震工程, 1995(2):1–7.
[8]吴波,李惠,林立岩,等.东北某政府大楼采用摩擦阻尼器进行抗震加固的研究[J].建筑结构学报, 1998, 19(5):28–36.