摘要
以实际某煤矿开采工程项目为研究对象,针对该项目内部存在的基本顶直覆现象展开采煤工艺的实践探索,并最终归纳出合适煤矿基本顶环境的采煤工艺,保障采煤生产的有效进行。
Taking an actual coal mine mining project as the research object, this paper explores the practice of coal mining technology aiming at the basic roof overburden phenomenon existing in the project, and finally concludes the suitable coal mining technology for the basic roof environment of coal mine, so as to ensure the effective coal mining production.
引文
[1]张国有.煤矿顶分层及假顶下采煤工艺特点分析[J].黑龙江科技信息,2013(24):130.
[2]彭广庆.长壁工作面顶煤冒放性评价及放顶煤采煤法适用条件探析[J].科技创业家,2013(14):45-48.
[3]樊运策.综放开采技术20年的回顾和展望:地下开采现代技术理论与实践[M].北京:煤炭工业出版社,2012.
[4]张永贵,武成权,杨晓晨.浅谈综采放顶煤采煤法高效安全应用的问题[J].山东煤炭科技,2011(4):196-198.