摘要
燃煤电厂大多临海而建,需配套煤炭卸船码头和输煤栈桥,煤炭卸船码头是电厂进口煤炭的"咽喉",码头和栈桥的设计主要尺度选择尤为重要,对码头工程投资有较大影响,决定着码头运营的灵活性以及维修的便捷性,是保证燃煤电厂正常运转的重要一环。本文结合东南亚地区燃煤电站项目配套码头工程的通常情况,对不同类型的卸煤码头主尺度的选择进行了探讨。
Most of the coal-fired power plants are built near coast, which should be associated with coal unloading berth and coal conveying trestle. Among them, the coal unloading berth serves as a critical link of importing coal to the power plant. The main design dimensions of the berth and trestle are very important, which will affect the project investment to a high extent, support the flexible work and convenient maintenance of the berth, and guarantee the operation of the coal-fired power plant. Based on the associated berth projects of the coal-fired power plants in South East Asia, the main design dimensions for different types of coal unloading berth are researched and discussed in detail.
引文
[1]交通部第一航务工程勘察设计院.海港工程设计手册:上册[M].北京:人民交通出版社,2001:810-816.
[2]JTS 165-2013海港总体设计规范[S].
[3]郑雪纬,张树元.绥中电厂码头工艺设备选型研究[J].港工技术,2013,50(05):10-16.