摘要
绥中发电厂二期工程配套码头项目采用离岸引桥式码头布置形式,本文结合工程周边项目现状、自然条件及工程近远期发展对码头平面布置展开研究,优化比选出推荐方案并通过数学模型验证。
An offshore jetty attached with an approach trestle is designed for the Phase 2 Coal Terminal of Suizhong Power Plant. Studies have been conducted on the general layout of the coal terminal, taking into account the existing environment of the project, the natural conditions of the site and the development trend of the terminal. Through the comparison among a number of plans, an optimized option is finally worked out and recommended, and verified by mathematic model.
引文
[1]中交第一航务工程勘察设计院有限公司.绥中发电厂二期工程配套码头项目初步设计[R].2015.
[2]交通运输部天津水运工程科学研究所.绥中电厂5万t级码头工程港池、航道泥沙淤积研究报告[R].2013.
[3]交通运输部天津水运工程科学研究院.绥中发电厂二期工程温排水数学模型试验报告[R].2012.
[4]绥中县人民政府,绥中县港航管理局,广东省航运规划设计院.葫芦岛港总体规划(修订)[R].2013.
[5]JTS 165-2013海港总体设计规范[S].北京:人民交通出版社,2014.