摘要
结合梅汕客专枫江特大桥承台施工采用钢板桩围堰技术,利用MIDAS/Civil建立有限元计算模型,对其钢板桩围堰工程不同施工阶段中钢板桩的最大应力、最大变形、支撑的最大应力等进行分析。在此基础上,结合规范公式计算分析了基坑稳定性及抗倾覆稳定性。结果表明,围堰结构的设计满足强度、刚度、稳定性要求。
Combined with the steel sheet pile cofferdam technology used in the foundation construction of Fengjiang Bridge of Meizhou-Chaoshan passenger special line project,the finite element calculation model is established by MIDAS/Civil,and the maximum stress and the maximum deformation of steel sheet pile and the maximum stress of the support in different construction stages of steel sheet pile cofferdam project are analyzed. On this basis,the stability and anti-overturning stability of foundation excavation are calculated and analyzed with the code formula. The results show that the design of cofferdam meets the requirements of strength,stiffness and stability.
引文
[1]王文印,张璐,杨学臻,等.深水基础钢板桩围堰施工技术[J].上海铁道科技,2017(2):85-86.
[2]路桥集团第一公路工程局.公路桥涵施工技术规范:JTG/T F50—2011[S].北京:人民交通出版社,2011.
[3]胡梦妮.钢板桩围堰施工优化设计研究[D].武汉:武汉工程大学,2015.
[4]李皖宁.海河大桥钢板桩围堰设计施工关键技术研究[D].邯郸:河北工程大学,2013.
[5]张家伦,黄旺明.五峰山长江大桥4号墩承台施工关键技术[J].上海铁道科技,2018(2):74-76.
[6]肖劲洪.绥江特大桥水中基础钢板桩围堰设计计算实例[J].城市道桥与防洪,2013(8):131-133.
[7]张骏.桥梁深水基础钢板桩围堰受力分析与应用[J].桥梁建设,2012,42(5):74-81.
[8]苏凤涛.蒙华铁路深水低桩承台围堰方案的设计优化[J].山西建筑,2016,42(15):173-174.