摘要
S109FA燃气-蒸汽联合循环机组在调试过程中,出现了汽轮机3号轴承振动异常情况,直接影响机组的安全稳定运行。通过对调试机组振动现象的研究,分析振动产生的原因,采取有效手段给予解决,确保机组调试工作顺利进行。
The S109 FA gas- steam combined cycle units in the process of debugging, the steam turbine No. 3 bearing vibration anomalies, directly affect the safe and stable operation of the unit. Based on the research of the debug unit vibration phenomenon, via the analysis of the causes of vibration, the cause of the vibration was analyzed, and the effective means were taken to solve the problems, to ensure the unit commissioning work running smoothly.
引文
[1]吴文健,吴斌,戴惠庆.大型9FA燃气发电机组的振动试验研究及处理[J].浙江电力,2013(7):38-41.
[2]钮志峰,张平.S109FA机组88VG风机对3号轴承振动的影响分析[J].华电技术,2012(4):26-28.
[3]储荣清.S109FA燃气—蒸汽联合循环机组轴系调整[J].燃气轮机技术,2008(3):61-63.