摘要
综合管廊的系统布局选线是综合管廊规划中的重要内容。国家规范和规划指引对于综合管廊的布局选线主要以定性判断为主,统筹考虑城市功能分区、地下空间开发、市政管线需求、重大基础设施和主要工程节点等因素。旨在探索一种利用ArcGIS定量分析干、支线综合管廊布局选线的手段,以辅助定性分析的过程及结论,从而使得综合管廊整体布局更为客观合理。
The system layout selection of utility tunnel is an important part of the utility tunnel planning. The national norms & planning guidelines are mainly based on qualitative judgments for the layout selection of utility tunnel, taking into account factors such as urban functional zoning, underground space development, municipal pipeline demand, major infrastructure and major engineering nodes. The purpose of this paper is to explore a method of quantitative analysis of the layout and route selection of integrated pipeline galleries on trunk and branch lines by using ArcG IS, so as to assist the process and conclusion of qualitative analysis, so as to make the overall layout of integrated pipeline galleries more objective and reasonable.