在铁路工程施工过程中,架设T梁是重要的施工环节之一,其施工的质量和效率对于铁路工程的整体施工都具有十分重要的影响。为了进一步加快我国铁路事业的发展,在铁路工程的T梁施工中采用了预制架设技术,该技术通过标准化的工业生产模式有效提高了T梁施工的效率以及质量,同时,也使铁路工程的施工成本得到了降低,因此,施工单位应准确掌握T梁预制施工以及架设的相关技术要点,全面提高铁路工程的施工水平。
In the construction process of railway engineering, erecting T-beam is one of the important construction links. Its construction quality and efficiency have a very important impact on the overall construction of railway engineering. In order to further accelerate the development of railway industry in China, prefabricated erection technology is currently used in the construction of T-beam in railway engineering. This technology effectively improves T-beam through standardized industrial production mode. The efficiency and quality of beam construction also reduce the construction cost of railway engineering. Therefore, the construction unit should accurately grasp the relevant technical points of T-beam prefabrication construction and erection, and comprehensively improve the construction level of railway engineering.
引文
[1]潘璇.铁路工程T梁预制与架设施工技术[J].建筑技术开发,2018,45(7):109-110.
[2]隋宇.铁路工程T梁预制与架设施工技术概述[J].工程技术研究,2018(1):59-60.
[3]李琳.浅析铁路工程T梁预制与架设施工技术[J].科技创新与应用,2015(8):155-156.