基于MATLAB复合形法的流坝段优化设计
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Optimization design of overflow dam section based on complex method of MATLAB
  • 作者:李振宇
  • 英文作者:LI Zhen-yu;
  • 关键词:河湾水电站 ; 流坝段 ; 复合形法 ; 优化设计
  • 英文关键词:Hewan hydropower station;;overflow dam section;;complex method;;optimization design
  • 中文刊名:DBSL
  • 英文刊名:Water Resources & Hydropower of Northeast China
  • 机构:辽宁润中供水有限责任公司;
  • 出版日期:2019-02-15
  • 出版单位:东北水利水电
  • 年:2019
  • 期:v.37;No.415
  • 语种:中文;
  • 页:DBSL201902001
  • 页数:4
  • CN:02
  • ISSN:22-1097/TV
  • 分类号:4-6+74
摘要
文中以辽宁省丹东凤城市的河湾水电站为例,采用基于MATLAB复合形法进行了流坝段优化设计研究,结论显示:在基本组合工况和特殊组合工况下,流坝段断面积优化率分别为16.74%和14.77%,优化效果十分明显。
        Taking the Hewan hydropower station in Fengcheng County of Dandong City of Liaoning Province as an example,the optimization design of overflow dam section is studied by using complex method of MATLAB. The result shows that, under the basic combined working conditions and special combined working conditions, the area optimization ratio of the overflow dam section is 16.74% and 14.77%, and then the optimization effect is evident.
引文
[1]孙翔,潘自恒,张志彦,王军.石步河水库工程碾压混凝土重力坝设计[J].水利规划与设计,2016(08):109-112.
    [2]陈松林.方家沟水库碾压混凝土重力坝优化设计[J].水利科技与经济,2015,21(02):51-53.
    [3]魏秀霞.试析农村水利水电工程管理发展[J].河南水利与南水北调,2015(02):48-49.
    [4]混凝土重力坝设计规范[M].北京:中国水利水电出版社,2005.
    [5]张社荣,杜成波,撒文奇,王高辉,王超.RCC重力坝全尺度结构安全与进度耦合动态仿真[J].系统仿真学报,2015,27(01):57-62.
    [6]陈,启方.重力式挡土墙结构优化设计的复合形法[J].信阳师范学院学报(自然科学版),2007(03):297-299.
    [7]陈刚,张林,陈健康,何显松.复合形法在拱坝结构可靠度分析中的应用[J].水利学报,2003(02):98-101+106.
    [8]韩致信,周和平,马历民,王玉鹏.混合约束最优化问题的复合形解法[J].甘肃工业大学学报,2001(04):33-36.
    [9]苏桐鳞.酒泉市洪水河水库坝址方案比选[J].水利规划与设计,2017(09):40-42+45.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700