摘要
人工岛短期填海区地质因回填时间短、土质稳定性差,造成地基承载力低、地基不均匀沉降严重,对原海相淤泥的处理是此类地质区地基处理的关键;通过青岛东方影都酒店群工程的施工实例,阐述了夯填挤淤置换施工新技术的工艺原理、施工工艺及控制要点等,该技术的成功研究与应用,为今后类似工程的设计、施工和业主决策提供了经验和借鉴依据。
For the short backfill time and poor stability of soil in the short-term reclamation geological island,the poor bearing capacity of foundation and uneven settlement is caused. On the original marine,sludge treatment is the key factor of such geological area foundation treatment. Through the construction engineering of Qingdao oriental hotel group, the process principle and control points of dynamic compaction backfilling replacement silt construction technology are described. The success of the technology research and application provides an experience and reference for the decision-making owners for the future similar project design and construction.
引文
[1]中国建筑科学研究院.GB50007—2011建筑地基基础设计规范[S].北京:中国建筑工业出版社,2011.
[2]中国建筑科学研究院.JGJ79—2012建筑地基处理技术规范[S].北京:中国建筑工业出版社,2012.
[3]山西省机械施工公司,山西建筑工程(集团)总公司.CECS279∶2010强夯地基处理技术规程[S].北京:中国计划出版社,2010.
[4]韩云山,段伟,安明,等.强夯振动效应研究[J].施工技术,2015,44(5):111-116.
[5]郭伟林,安明.强夯振动传播机理与地基振动特性的探讨与验证[J].施工技术,2014,43(7):76-79.
[6]闫续屏,吕和蔼.超高能级强夯法处理人工冲填填海地基[J].施工技术,2013,42(19):80-84.