摘要
智能变电站的建设是一个多方参与、多专业协同的复杂工程,全站系统配置描述(SCD)文件作为智能变电站的统一数据源,在智能变电站的建设、运行过程中起着极为重要的作用。将SCD文件的集成过程进行优化,去除集成过程中的冗余环节,明确接口文件,技术上提供专业的工具支撑,降低模块的依赖关系,进而优化设计、组态、调试过程。青岛220 kV变电站改造工程实例证明,该方法重新定义了设计单位、设备提供商、集成商之间的工作模式和工作接口,有利于提高各单位之间的配合效率,提高工程建设质量,缩短建设周期。
Smart substation construction is a complex project involves multiple party participation and multiple professional collaboration.As the unity intelligent substation data source,Substation Configuration Description(SCD) file plays a very important role in station construction and operation process.SCD file integration process is optimized and redundancy link is removed.The interface file is clarified and dependency among modules are reduced.One exemplary station renovation project shows that proposed method redefines working modes and interfaces among design institute,equipment providers and integrators.Both cooperation efficiency among various units and construction quality are improved with shortened construction period.
引文
[1]韩本帅,石嫔,孙中尉,等.智能变电站高级应用实施方案研究[J].中国电力,2013,46(8):148-152.HAN Benshuai,SHI Pin,SUN Zhongwei,et al.Research of implementation plan for advanced applications in smart substations[J].Electric Power,2013,46(8):148-152.
[2]樊陈.基于IEC61850标准的变电站IED配置研究[D].成都:西南交通大学,2007.
[3]葛雅川,尹军.智能变电站基于IEC 61850服务跟踪模型研究[J].中国电力,2013,46(11):142-145.GE Yachuan,YIN Jun.Study on service tracking model of smart substations based on IEC 61850 standard[J].Electric Power,2013,46(11):142-145.
[4]樊陈,倪益民,窦仁晖,等.智能变电站信息模型的讨论[J].电力系统自动化,2012,36(13):15-19.FAN Chen,NI Yimin,DOU Renhui,et al.Discussion on smart substation information model[J].Automation of Electric Power Systems,2012,36(13):15-19.
[5]朱利君,邵剑峰,李萼青,等.智能变电站设备建模与组态配置[J].华东电力,2016,40(6):967-969.ZHU Lijun,SHAO Jianfeng,LI Eqing,et al.Intelligent substation equipment modeling and SCD configuration[J].East China Electric Power,2016,40(6):967-969.
[6]笃峻,胡绍谦,藤井玉,等.数据源端维护技术在继电保护信息系统中的应用[J].电力自动化设备,2015,35(3):162-169.DU Jun,HU Shaoqian,TENG Jingyu,et al.Application of data source maintenance technology in relay protection information system[J].Electric Power Automation Equipment,2015,35(3):162-169.
[7]杨臻,赵燕茹.一种智能变电站一体化信息平台的设计方案研究[J].华北电力大学学报,2012,39(3):59-64.YANG Zhen,ZHAO Yanru.Design and study of an integrative information platform for smart substation[J].Joural of North China Electric Power University,2012,39(3):59-64.
[8]温东旭,陈延昌,许沛丰,等.IEC61850配置的工程应用探讨[J].电力系统保护与控制,2009,37(5):26-30.WEN Dongxu,CHEN Yanchang,XU Peifeng,et al.Engineering application research of IEC61850 configuration[J].Power System Protection and Control,2009,37(5):26-30.
[9]高媛,常弘,汪俊峰,等.基于IEC61850的IED配置工具的研究与实现[J].电工电能新技术,2012,31(1):84-89.GAO Yuan,CHANG Hong,WANG Junfang,et al.Research and implementation of IED configuration tool based on IEC61850[J].Advanced Technology of Electrical and Energy,2012,31(1):84-89.
[10]童晓阳,李岗,陈德明,等.采用IEC61850的变电站间隔层IED软件设计方案[J].电力系统自动化,2006,30(14):54-57.TONG Xiaoyang,LI Gang,CHEN Deming,et al.IEC 61850 based software design schema of bay level IED in substations[J].Automation of Electric Power Systems,2006,30(14):54-57.
[11]肖健,姚文莹,吴国沛,等.调度集控自动化系统远动信息接入预处理软件设计[J].南方电网技术,2011,5(1):22-24.XIAO Jian,YAO Wenying,WU Guopei,et al.Design of the telecontrol data pre-processing software for integrated dispatching and central-control automation system[J].Southern Power System Technology,2011,5(1):22-24.
[12]石文江,李论,洪一云.提高厂站接入主站调试效率的方法[J].东北电力技术,2015,36(6):24-26.SHI Wenjiang,LI Lun,HONG Yiyun.A method to improve the debugging efficiency of station-access-master in dispatching automation system[J].Northeast Electric Power Technology,2015,36(6):24-26.