摘要
介绍一种新的火电厂除灰系统:将灰库设置在除尘器下,与除尘器合为一体,除尘器中分离出来的干灰,在重力作用下,直接落入灰库,并在除尘器下直接装车外运。系统简单,节约能耗。
A new thermal power plant ash removal system is introduced.The ash silo is placed under the dust collector so that the two parts are integrated.The dry ash separated in the precipitator will fall into the ash silo directly due to gravity.The trucks for taking the ash out can be parted under the dust collector which facilitates the loading process.The system is simple and energy saving.
引文
[1]中华人民共和国国家能源局.火力发电厂除灰设计技术规程:DL/T 5142—2012[S].北京:中国计划出版社,2012.
[2]中国电力工程顾问集团有限公司.电力工程设计手册:火力发电厂除灰设计[M].北京:中国电力出版社,2017.
[3]山东电力工程咨询院有限公司.火电厂浓相气力输送系统:ZL201320383766.3[P].2013-12-04.
[4]山东电力工程咨询院有限公司.带有隔热层的燃料锅炉粉尘分离收集设施:ZL201420631179.6[P].2015-03-11.
[5]山东电力工程咨询院有限公司.一种新型的燃料锅炉粉尘分离收集设施:ZL201410588322.2[P].2016-11-30.