摘要
基于既能加快内、外业作业进度,又能满足现实测量工作条件的目的,文中以合肥某盾构隧道结构横断面实际测量作业为背景,提出了一种利用全站仪结合最小二乘空间拟合的方法对盾构隧道结构横断面测量数据进行处理。通过将该方法处理获得的数据与实际测量值进行比较,结果显示采用该方法对地铁盾构隧道结构横断面测量数据进行处理是可行且准确的。同时,在保证一定数目的测量点参与拟合计算的前提下,该方法可在一定程度上降低测量环境对工作的制约,使得工作效率大大提高。
The paper takes the shield tunnel cross-section measurement of actual operatic in Hefei urban rail transit construction as the background,it puts forward a method of measurement data processing which combines the total station and least square method. Compared with the design results,the calculated results by the least square method is feasible and accurate. At the same time,it reduces the influences of measurement environment on the survey work to some extent and it makes the work efficiency is greatly increased under the premise that ensure there is a sufficient number of measurement point in fitting calculation.
引文
[1]武汉大学测绘学院测量平差学科组.误差理论与测量平差基础[M].武汉:武汉大学出版社,2003.
[2]陶本藻.测量数据处理的统计理论和方法[M].北京:测绘出版社,2007.
[3]陈大勇.地铁盾构隧道洞门圈中心坐标测量与数据处理方法的探讨[J].城市勘测,2008(2):86~89.
[4]王思锴.城市轨道交通工程隧道结构断面测量技术方法的实践与探索[J].城市勘测,2011(1):130~132.
[5]王荣权.轨道交通工程隧道结构断面测量技术与方法[J].铁道勘察,2008,34(1)17~19.
[6]贺磊,韩旭,陆晓勇.地铁盾构隧道断面测量数据的处理研究[J].测绘通报,2015(6):79~81.
[7]蒋勇.城市轨道交通调线调坡测量中圆隧道横断面测量方法的探讨[J].城市勘测,2011(2):142~144.
[8]高俊强,陶建岳.利用免棱镜全站仪进行地铁隧道断面测量与计算[J].测绘通报,2005(10):41~43.