土压平衡矩形顶管施工引起的地表沉降探究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Ground Subsidence Caused by Earth Pressure Balanced Rectangular Pipe Jacking Construction
  • 作者:银英姿 ; 赵强 ; 崔芳静 ; 贾琦 ; 刘斌
  • 英文作者:YIN Ying-zi;ZHAO Qiang;CUI Fang-jing;JIA Qi;LIU Bin;College of Architecture and Civil Engineering,Inner Mongolia University of Science and Technology;The Yellow Sea Qingdao College;
  • 关键词:顶管施工 ; 大断面矩形土压平衡法 ; 地下通道 ; 路基变形 ; 数值模拟
  • 英文关键词:pipe jacking construction;;rectangular earth pressure balance;;underground passage;;subgrade deformation;;numerical simulation
  • 中文刊名:CJKB
  • 英文刊名:Journal of Yangtze River Scientific Research Institute
  • 机构:内蒙古科技大学建筑与土木工程学院;青岛黄海学院;
  • 出版日期:2019-01-15
  • 出版单位:长江科学院院报
  • 年:2019
  • 期:v.36;No.243
  • 基金:内蒙古自治区自然科学基金项目(2013MS0717,2017MS(LH)0523)
  • 语种:中文;
  • 页:CJKB201901023
  • 页数:7
  • CN:01
  • ISSN:42-1171/TV
  • 分类号:99-105
摘要
顶管施工引起周围土体移动会对路面结构层造成破坏。采用大断面矩形土压平衡顶管顶进工法所引起的地表沉降一直是岩土工程领域技术工作者所关注的热点与难点之一。通过内蒙古科技大学地下过街通道工程,分析了路基变形的实测数据,Peck公式对矩形顶管地表变形预测的适用性,数值模拟不同覆土深度下的顶管施工对地表的变形影响。研究表明:顶进时轴线上的纵向测点变形总趋势是先隆起,后沉降,并趋于稳定状态;横断面上位于轴线10 m左右范围内为主要影响区域,在此范围内沉降槽体积约占总体积的90%;当地层损失率Vl取0.4%,沉降槽宽度参数K取0.4时,实测值与Peck公式法的预测结果曲线拟合较好;当覆土深度增加,地表沉降值逐渐减小,且沉降范围逐渐增大。研究成果为大断面土压平衡矩形顶管与类似工程的施工提供了理论参考及应用借鉴。
        The ground subsidence caused by rectangular soil pressure balanced pipe jacking construction in large section would damage the pavement structure layer,which has always been a difficulty and hot topic in geotechnical engineering. With the underground passage project in the Inner Mongolia University of Science and Technology as a case study,we analyzed the measured data of subgrade deformation and the applicability of Peck's formula in predicting ground subsidence caused by rectangular pipe jacking,and also simulated the influence of pipe jacking construction in the presence of different soil depths on ground subsidence numerically. We found that,in general,measuring points in longitudinal direction on the jacking axis bulged at first,and then subsided and subsequently tended to be stable; in terms of cross section,pipe jacking affected an area within 10 meters of the axis,where the volume of settling trough occupied 90% of the total volume. When soil strata loss rate equals 0.4% and width parameter K of settling trough equals 0.4,the measured value agrees well with the results predicted by Peck's formula. With the increase of overburden soil depth,the surface subsidence decreased gradually,and the settlement range gradually increased. The research results provide theoretical reference and application value for the construction of large cross-section soil pressure balanced rectangular pipe jacking and similar projects.
引文
[1]朱合华.地下建筑结构[M].北京:中国建筑工业出版社,2006.
    [2] PECK R B.Deep Excavation and Tunneling in Soft Ground.State of the Art Report[C]∥Proceedings of the Seventh International Conference on Soil Mechanics and Foundation Engineering. Mexico City,1969:225-281.
    [3] O’REILLY MP,ROGERS CDF. Ground Movement Associated with Pipe Jacking and Trenching[C]∥Proceedings of the Fifth International Conference of No Dig 90Rotterdam. Rotterdam,April 23-25,1990:B1-B8.
    [4]邓长茂,彭基敏.软土地区顶管施工地表变形控制措施探讨[J].地下空间与工程学报,2016,12(4):1002-1007.
    [5]苏海东.盾构法隧洞的平面非线性有限元分析[J].长江科学院院报,2000,17(4):22-26.
    [6]杨转运.超浅层顶管施工引起路基地层移动数值模拟[J].重庆建筑大学学报,2008,30(5):58-62.
    [7]龚尚龙,杨转运,陈思甜.采用随机介质理论分析超浅层曲线顶管施工引起的地表沉降[J].重庆交通学院学报,2005,24(6):95-98.
    [8]孙闯,张建俊,刘家顺,等.盾构隧道壁后注浆压力对地表沉降的影响分析[J].长江科学院院报,2012,29(11):68-72.
    [9]王斌,陈帅,陶柏峰,等.顶管穿越路堤实测地基变形和扰动程度分析[J].岩石力学与工程学报,2010,29(增1):2805-2812.
    [10]沈明荣.岩体力学[M].上海:同济大学出版社,1999:109-111.
    [11]万维燕.土压平衡盾构过圆砾土层施工技术浅析[J].隧道/地下工程,2011,(3):33-36.