软土地区基坑开挖对临近电力顶管隧道影响研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:The Influence Study on Excavation Area of Neighboring Power Tunnel in Soft Soil
  • 作者:宋文新 ; 郑斌 ; 罗伟锦 ; 杨兰强
  • 英文作者:Song Wenxin;Zheng Bin;Luo Weijing;Yang Lanqiang;Ningbo Electric Power Supply Company,State Grid Corporation of China;Zhejiang Engineering Investigation Institute;
  • 关键词:基坑 ; 顶管隧道 ; 数值模拟 ; 监测
  • 英文关键词:excavation;;pipe-jacking tunnel;;numerical simulation;;monitoring
  • 中文刊名:KJTB
  • 英文刊名:Bulletin of Science and Technology
  • 机构:国网宁波供电公司;浙江省工程勘察院;
  • 出版日期:2018-11-30
  • 出版单位:科技通报
  • 年:2018
  • 期:v.34;No.243
  • 语种:中文;
  • 页:KJTB201811043
  • 页数:8
  • CN:11
  • ISSN:33-1079/N
  • 分类号:205-211+216
摘要
由于岩土工程地域性非常强,关于宁波软土地区基坑开挖对电力顶管隧道影响的研究报道并不多。为此,结合工程实例,从有限元数值模拟以及现场监测综合分析,从中得到如下结论:通过数值模拟与现场监测数据结果基本吻合。说明设计阶段可以利用有限元方法进行变形评估,施工阶段利用监测实时反馈,调整设计。隧道变形曲线大体呈现中间大,两头小的特点。分块开挖,及时浇筑垫层可抑制基坑变形的发展。地面沉降监测点总体呈下沉态势,与电力隧道最大变形,支护桩水平最大变形发生的时间一致。
        Due to the regional experience is very strong in geotechnical engineering. The research reported about excavation in soft soil area of ningbo influenced on pipe jacking tunnel is not much. Therefore combining with engineering examples, from the FEM numerical simulation and field monitoring, by comprehensive analysis can get the following conclusion. Through the numerical simulation result was consistent with field monitoring data. It can expained that the finite element method can used in design phase to evaluate deformation. The monitoring feedback will be used to guide the design during construction. The tunnel deformation curve presented us the characteristics of the middle huge, but the two small head. Partitioned excavation and timely casting cushion inhibits the development of excavation deformation. The ground subsidence was sinking by monitoring, which was occurred at the same time with the maximum power tunnel deformation and horizontal maximum support pile deformation.
引文
[1] 谢雄耀,郁宏杰,王庆国,等. 基坑开挖引起下卧既有电力隧道变形的控制技术研究[J]. 岩土工程学报,2014,01:88-97.
    [2] 刘庭金. 基坑施工对盾构隧道变形影响的实测研究[J]. 岩石力学与工程学报,2008,S2:3393-3400.
    [3] 陈培泰. 地铁盾构推进对相邻已建顶管隧道的影响分析[J]. 地下工程与隧道,2005,04:41-42+64.
    [4] 魏纲,余振翼,徐日庆. 顶管施工中相邻垂直交叉地下管线变形的三维有限元分析[J]. 岩石力学与工程学报, 2004, 15:2523-2527.
    [5] CJJ/T 202-2013 城市轨道交通结构安全保护技术规范[S]. 2013.[CJJ/T 202-2013
    [6] 徐中华, 王卫东. 敏感环境下基坑数值分析中土体本构模型的选择[J]. 岩土力学, 2010, 31(1): 258-264.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700