摘要
溢流重力坝设计和施工时需要计算并绘制堰面曲线及堰剖面图,关于堰顶为克-奥曲线的堰面曲线的连接计算已有文献介绍过,而关于堰顶为WES曲线的连接计算已有文献介绍,但繁琐且不够准确。据此,文章介绍堰顶为WES曲线的堰面曲线的计算与绘制,此方法比现有的各种方法都直接、方便、简单、准确。
The weir surface curve and weir section shall be calculated and mapped when the overflow gravity dam is designed and constructed. Calculation on connection of the weir surface curves is available when the weir top is of the CO curve. The connection calculation is also available when the weir top is of the WES curve but it is complicated and inaccurate. Therefore,calculation and mapping of the weir surface curve are introduced in this paper when the weir top is of the WES curve. This method is direct,convenient,simple and accurate than other calculation methods.
引文
[1]刘崇选.克一奥型实用堰剖面各段曲线的的解析式及其连接的计算[J].陕西水力发电,1990(03):45-49.
[2]水利水电规划设计院.水工设计手册混凝土坝[M].2版.北京:中国水利水电出版社,1987:32-33.
[3]林继镛.水工建筑物[M].北京:中国水利水电出版社,1981:91-93.
[4]王学功.关于等腰三角形三边斜率的一个定理及其工程应用[J].水利水电技术,2005(02):48-51.
[5]华东水利学院.水力学[M].上册.北京:科学出版社,1979:111-115.
[6]华东水利学.水工设计手册[M].6卷.北京:水利电力出版社,1987:6-173~6-189.
[7]刘鸿文.材料力学[M].上册.北京:人民教育出版社,1979:296-300.
[8]同济大学数学教研室.高等数学[M].上册.北京:人民教育出版社,1978:92-439.
[9]四川矿业学院数学教研组.数学手册[M].北京:科学出版社,1978:67-97,149-217.