摘要
团柏煤矿8231机巷过FX11断层,该断层落差近6m造成施工困难。本文对8231机巷过FX11断层进行了实践应用研究,通过准确定性、精确定位,采用人工干预措施,提前刹底撵煤,减少破矸量。实践应用效果表明:8231机巷顺利快速过FX11断层,通过效益对比分析可知该施工方案取得了很好的经济效益。
The 8231 machine roadway of Tuanbai Coal Mine passes through the FX11 fault, and the drop of the fault is nearly 6m, which makes the construction difficult. In this paper, 8231 machine roadway crossing FX11 fault has been applied in practice. Through accurate qualitative and precise positioning, manual intervention measures are adopted to drive out coal ahead of time and reduce waste. Practical application results show that 8231 machine roadway passes through FX11 fault smoothly and quickly. Through the benefit comparison analysis, it can be seen that the construction scheme has achieved good economic benefits.
引文
[1]李孝宇.综采工作面快速过断层构造带的方法与措施[J].山东煤炭科技,2017(03):15-16+20.
[2]张光文.综采工作面快速过断层技术的推广及应用[J].山西焦煤科技,2009(01):7-8.
[3]周明,王同吉,张卫松,等.煤巷综合机械化掘进快速过断层技术[J].煤炭科学技术,2009,37(03):7-9+50.
[4]彭涛.大采高综采工作面快速过断层生产技术实践[J].陕西煤炭,2016,35(04):107-110.
[5]李永,陈爱和,蒋宇帆.6_131工作面快速过断层技术研究与优化[J].煤炭技术,2018,37(01):64-66.
[6]甘承博.浅析复杂地质条件下的煤矿掘进支护技术应用[J].技术与市场,2018(05):154-155.