摘要
海宁尖山污水处理厂的升级改造工程处理规模为5×10~4m~3/d,在综合分析污水厂现有工艺、占地、进出水指标及运行状况的基础上,采用Bardenpho+MBR工艺进行升级改造,出水水质稳定达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准,并有继续提升的空间。
The design capacity of upgrading and reconstruction project of Haining Jianshan WWTP was 5 × 10~4 m~3/d. Based on the comprehensive analysis of existing process,footprint,influent and effluent quality indexes and operation situation of the WWTP,Bardenpho and MBR process was adopted in the upgrading and reconstruction. The effluent quality met the first class A standard in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) and could be further improved.
引文
[1]沈晓铃,张万里,梁汀,等.SBR类污水处理厂升级改造工艺选择及运行[J].给水排水,2010,36(7):38-41.Shen Xiaoling,Zhang Wanli,Liang Ting,et al.Process selection and operation of upgrading reconstruction of SBRwastewater treatment plant[J].Water&Wastewater Engineering,2010,36(7):38-41(in Chinese).
[2]郑兴灿.城镇污水处理厂一级A稳定达标技术[M].北京:中国建筑工业出版社,2015.Zheng Xingcan.Technologies for Compliance with Effluent Discharge Standard of WWTP in China[M].Beijing:China Architedture&Building Press,2015(in Chinese).
[3]Dorea C C,Clarke B A.Effect of aluminium on microbial respiration[J].Water Air Soil Pollut,2008,189(1/2/3/4):353-358.