摘要
船舶及海洋工程产业的发展日新月异,对于船舶及海洋工程而言,传统的建造方式为独立制造管路、通风及电气并焊接各自的支撑件,这样会造成同一区域多种生根件的反复焊接。同时,在管机电密集区域的生活楼上,后期修改需要重复地进行火工作业,鉴于管路、通风和托架等安装件的重量相对较轻,建议采用支撑件整体安装方案以避免这种情况发生。
The development of the marine and offshore engineering industry is changing with each passing day. For marine and offshore engineering, the traditional method of construction is to independently manufacture pipes, ventilate and electrically and weld the respective supports, which will result in repeated welding of multiple rooting parts in the same area. At the same time, in the living building of the electromechanical-intensive area, the later modification requires repeated fire work. In order to avoid this kind of situation, in view of the pipe, ventilation and cable tray leader to install a relatively light in weight,recommended to use the whole installation scheme.
引文
[1]马延德.浮式生产储油船(FPSO)设计建造研究[D].辽宁大连:大连理工大学, 2008.
[2]周启学.船舶生产设计[M].北京:人民交通出版社,2007.
[3]胡毓.迎接安全新挑战FPSO期待技术完善[N].北京:中国船舶报, 2011-06-29.