大跨度混合梁斜拉桥合理成桥状态研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Study on Reasonable Completed Bridge State of Long-span Composite Beam Cable-stayed Bridge
  • 作者:龚子松
  • 英文作者:Gong Zisong;
  • 关键词:混合梁斜拉桥 ; 合理成桥状态 ; 分步算法 ; 索力优化
  • 英文关键词:composite beam cable-stayed bridge;;completed bridge state;;fractional step algorithm;;optimization of cable force
  • 中文刊名:CSDQ
  • 英文刊名:Urban Roads Bridges & Flood Control
  • 机构:同济大学建筑设计研究院(集团)有限公司;
  • 出版日期:2019-03-15
  • 出版单位:城市道桥与防洪
  • 年:2019
  • 期:No.239
  • 语种:中文;
  • 页:CSDQ201903025
  • 页数:7
  • CN:03
  • ISSN:31-1602/U
  • 分类号:11-12+93-97
摘要
合理成桥状态是斜拉桥设计的重点和难点,结合混合梁斜拉桥的受力特点,总结分析确定合理成桥状态的基本原则,提出确定混合梁斜拉桥合理成桥状态的分步算法,基本思路为:根据相关工程经验初拟结构尺寸,先采用"改进零位移法"初定成桥状态,再采用"最小二乘法"将索力调均匀;计算活载效应,综合考虑成桥运营状态主梁弯矩均匀,正负弯矩大小相当,主塔弯矩较小,索力均匀及避免墩顶负反力等要求,对索力进行调整,边跨混凝土梁配置钢束;成桥运营状态验算。并以某大跨度混合梁独塔斜拉桥为工程实例进行计算分析,实践表明该方法简单实用,思路清晰,计算精度高,满足设计要求。
        The reasonable completed bridge state is the key points and difficulties in the design of cable-stayed bridge. Combined with the stress characteristics of composite beam cable-stayed bridge, this paper sums up, analyses and determines the basic principle of reasonable completed bridge state, and puts forward and determines the fractional step algorithm of the reasonable completed bridge state of composite beam cable-stayed cable. The basic idea is as follow: according to the relative engineering experience, the structure dimensions are drawn up, the "improved zero displacement method" is firstly used to decide the state of completed bridge, and then the "least square method" is used to adjust the cable force evenly. The live load effect is calculated. It is to comprehensively consider the bending moment uniform of the main beam,equal positive and negative bending moments, smaller bending moment of the main pylon, cable force uniform and avoiding the negative reaction of pier top in the operation state of completed bridge. The cable force is adjusted and the side-span concrete beam is set up with steel tendons. The operation state of completed bridge is checked and calculated. The engineering example of a long-span composite beam single-pylon cable-stayed bridge is calculated and analysed. The practice shows that this method is simple and useful with the clear thinking and high calculation accuracy, and can meet the design requirements.
引文
[1]陈开利,余天庆,习刚.混合梁斜拉桥的发展与展望[J].桥梁建设,2005(2):1-4.
    [2]颜东煌.斜拉桥合理设计状态确定与施工控制[D].湖南长沙:湖南大学,2001.
    [3]张谢东,王金枝,郭俊峰.混合梁斜拉桥合理成桥状态确定方法研究[J].武汉理工大学学报:交通科学与工程版,2015,39(5):920-924.
    [4]贺鹏,丁望星.非对称混合梁斜拉桥合理成桥状态及静力特性分析[J].桥梁建设,2012,42(1):54-59.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700