摘要
文章针对宁德核电1~4号机组调试启动和大修期间多次出现的RCP090/091MN与RCP098MN偏差大问题原因进行分析,并提出应对措施的建议。
This paper analyzed the causes of the problems of RCP090/091 MN and RCP098 MN,which were repeated several times during the start-up and overhaul of Ningde Nuclear Power Unit,and put forward the suggestions of countermeasures.