方家山核电厂应急柴油发电机定期试验方法修改
详细信息    查看官网全文
摘要
介绍了M310堆型及其改进型压水堆核电厂的应急柴油发电机定期带载试验方法,分析了该方法存在的问题。根据IEEE387标准提出了应急柴油发电机定期带载试验采用并网试验的方法。修改后的试验方法是否可行取决于中压厂用电系统的短路电流是否超限,为此以方家山核电厂为例对应急柴油发电机并网试验情况下中压厂用电系统的短路电流进行了计算。计算结果表明中压厂用电系统三相短路电流未超限,修改后的试验方法满足相关标准规范的要求。
The periodic load testing method of the emergency diesel generator of M310 nuclear power plant is introduced,and its problems are analyzed.According to standard IEEE387,a modified method is put forward,which allows the emergency diesel generator connected to the grid to perform the periodic load test.The modified method which is feasible or not depends on the short-circuit current of the medium voltage electrical system during the test.That is to say the short-circuit current must not exceed the breaking capacity of the circuit break.The calculation results show that the three-phase short-circuit current of the medium voltage electrical system is not over the limitation,therefore the modified method meets the relevant standards requirements.
引文
[1]陆秀生,钟质飞,杨勇.CPR1000核电厂应急柴油发电机组试验方法研究[J].核动力工程,2011,32(1),25-28.
    [2]中国核电工程有限公司.方家山核电工程6.6 kV交流应急电源系统手册(C版CFC).北京:2013,4.
    [3]曹宇.核电厂应急柴油发电机组稳态调速率与机组定期试验模式关系的探讨[J].核动力工程,2011,32(增刊2),63-68.
    [4]DL/T 5153-2002,火力发电厂厂用电设计技术规定[S].
    [5]西北电力设计院.电力工程电气设计手册(电气一次部分)[M].北京:中国电力出版社,1989.12.
    [6]RCC-E 2005,核岛电气设备设计和建造规则[S].
    [7]IEEE387-1995,IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations[S].
    [8]KTA3702-2000,Emergency Power Generating Facilities with Diesel-Generator Units in Nuclear Power Plants[S].