成绵乐高速铁路机场路隧道3号人行天桥桩基托换施工与监测
详细信息    查看官网全文
摘要
根据隧道穿越建(构)筑物下的具体地质水文情况以及穿越建筑物的基础形式和穿越方式,对影响区域建筑物(构)筑物的基础和结构采取必要、有效的加固及托换措施,保证隧道顺利掘进和建(构)筑物结构安全。采用桩梁式预应力主动托换体系形式进行建(筑)物、桥梁托换,通过安全自锁装置对分级顶升力进行锁定限位,能更安全地满足隧道穿越桥梁的要求。
According to the specific geological and hydrological conditions under the buildings of the tunnel crossing and the basic form and the way through the building,the necessary and effective measures to strengthen and support the foundation and structure of the regional buildings and structures are adopted,which ensures the smooth tunneling and construction safety of the structure.The construction and the bridge are carried out by the pile beam prestressed active underpinning system and using the safety locking device to lock the lift of the classified top,which satisfies the requirement of the tunnel crossing bridge better.
引文
[1]交通部基本建设质量监督总站.桥涵工程试验检测技术[M].北京:人民交通出版社,2004.
    [2]四川建筑科学研究院.混凝土结构加固设计规范:GB50367-2006[S].北京:中国建筑工业出版社,2006.
    [3]中国建筑科学研究院.既有建筑地基基础加固技术规范:JGJ12322000[S].北京:中国建筑工业出版社,2000.
    [4]唐业清.建筑物改造与病害处理[M].北京:中国建筑工业出版社,2000.
    [5]唐业清.特种工程新技术[M].北京:中国建筑工业出版社,2009.
    [6]王长江.成绵乐高速铁路机场路隧道人行天桥桩基托换[J].山西建筑,2010,37(11):183-185.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700