某曲线连续梁桥顶升高度偏差原因分析及应对措施
详细信息    查看官网全文
摘要
曲线桥梁整体顶升工程中,顶升位移的同步控制是关键性技术的难点,实际工程经常出现偏差较大现象,甚至可能发生安全事故。对曲线连续桥梁顶升中外侧位移偏高的2种可能原因进行分析。在有限元内力计算和现场监测基础上给出某三跨曲线连续箱形梁顶升偏差产生的原因,提出通过对其顶升动力与位移监控系统编组调整的曲线桥平衡顶升措施。
Synchronous control of jacking displacement is a key technical difficulty in the integral jacking engineering of curved bridge.Significant deviation usually happened in actual project,and a safety accident may even been brought out.Two possible reasons why the jacking displacement of outer edge of the bridge is higher were discussed.Taking a three span curved continuous box girder as the example,based on the finite element calculation of internal force and the field monitoring,the reason of jacking deviation was given.In order to reduce the jacking deviation,the balance jacking measures by adjusting groups of the lifting jacks and the displacement monitoring points were put forward.
引文
[1]林耿雄,姜海波.桥梁顶升技术的探讨[J].广东建材,2008(10):65-68.
    [2]韩振勇,张振学,张玉明,等.桥梁改造工程中同步顶升技术的应用[J].中国市政工程,2007(1):24-25,96.
    [3]蓝戊己,顾远生,束学智,等.大型桥梁整体顶升平移关键技术[C]//第二届全国工程结构抗震加固改造技术交流会论文集.2010.
    [4]杜博.合肥在建高架桥坍塌致一人死亡系中铁四局承建.[EB/OL].http://society.people.com.cn/GB/41 158/15232361.html.2016-06-23.
    [5]蒋岩峰,蓝戊已.桥梁整体顶升关键技术研究[C]//首届全国既有结构加固改造设计与施工技术交流会论文集.2007.
    [6]隋渤海.上跨多股既有铁路钢筋混凝土连续梁桥综合施工技术[J].施工技术,2016,45(11):46-49.