强震高原季节性冻土区隧道洞口浅埋段施工探讨
详细信息    查看官网全文
摘要
"汶川5·12"震后修建的汶马高速鹧鸪山隧道出口端洞口位于浅埋偏压滑坡堆积体,常规方法进洞出现异常变形,通过地质补勘,采用地表注浆、锚索抗滑桩、钢管桩、抗偏压挡墙措施,左线隧道得以成功进洞;通过温度场监测,得出高原季节性冻土区温度变化规律,洞口100m长度采用径向注浆固结隧道周边1.5m范围围岩,洞口600m中心水沟埋置在冻土线下,洞口设保温出水口,控制冻融循环破坏隧道结构和排水系统,可为类似环境工程设计和施工提供借鉴。
The export of Zhegushan tunnel of Wenchuan Maerkang highway building after "5·12 Wenchuan earthquake" is at the bias of the shallow landslide,occurred abnormal deformation of conventional method,through geological prospecting,the left line tunnel is successfully entrance into the hole after use the measures of surface grouting,anchor cable anti slide pile,steel pipe pile,anti bias retaining wall,through the temperature field monitoring,it is concluded that the temperature change law of the seasonal frozen soil area,use the radial grouting to consolidate the surrounding rock of 1.5m range in the 100 m length of the tunnel,the center ditch of the portal 600 m length in the tunnel is buried under the frozen soil line,the hole using insulation outlet,control damage to the tunnel structure and drainage in the freeze-thaw cycle,which can provide reference for similar environmental engineering design and construction.
引文
[1]黄胜.高烈度地震下隧道破坏机制及抗震研究[D].中国科学院研究生院,2010,05.Huang Sheng.Study on the failure mechanism and seismic resistance of tunnel under high earthquake intensity[D],University of Chinese Academy of Sciences,2010,05.
    [2]郭美贤,等.城市地铁车站及隧道结构的震害分析及其对策[J].广州建筑,2006,6-24-27.Guo Meixian.Seismic Damage Analysis of Urban Subway Station and Tunnel Structure and the Seismic Damage Countermeasures[J].Guan Zhou Jian Zhu,2006,6:24-27.
    [3]王明年,林国进,于丽,等.隧道抗震与减震[M].科学出版社,2012,11.Wang Mingnian,Lin Guojin,Yu Li.Tunnel Seismic and shock absorption[M].Science Press,2012,11.
    [4]李天斌.汉川特大地震中山岭隧道变形破坏特征及影响因素分析[J].工程地质学报,2009,16(6):742-75.Li Tianbin.Analysis of failure characteristics and influencing factors of mountain tunnel deformation in Hanchuan earthquake[J].Journal of Engineering Geology,2009,16(6):742-75.
    [5]刘泽.季节性冻土区浅埋隧道两台阶留核心土施工技术[J].现代隧道技术,2013,50(6):163-173.Liu Ze.The two step with core soil construction technique in the seasonal frozen soil area of shallow buried tunnel[J].Modern Tunnelling Technology,2013,V50(6):163-173.
    [6]张扯道,王联.高海拔及严寒地区隧道防冻设计探讨[J].现代隧道技术,2004,41(3):1-6.Zhang Chedao,Wang Lian.Discussion on the design of tunnels in high elevation and bitter cold region[J].Modern Tunnelling Technology,2004,41(3):1-6.
    [7]杨小礼,李亮,刘宝琛.偏压隧道结构稳定性评价的信息优化分析[J].岩石力学与工程学报,2002(4).Yang Xiaoli,Li Liang,Liu Baochen.Evaluation on structure stability of unsymmetrically loaded tunnels using the theory of information optimization analysis[J].Chinese Journal of Rock Mechanics and Engineering,2002(4).

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700