公路工程项目是在复杂的自然和社会环境中进行露天作业的,其特点是建设周期长、投资多、技术要求高、内部结构复杂、外部联系广泛等。由此决定了在公路工程项目实施的过程中,存在着很多无法预计的不确定因素,而由这些不确定因素所带来的风险便会影响整个工程项目的实施。然而这些风险存在于工程项目当中又是不可避免的,如果不对它们采取任何控制措施,就会给业主和施工企业带来很大的损失。所以,风险就成为项目成败的关键。为避免其带给业主和施工企业的损失或减小影响,风险管理方面的研究就变得非常重要了。
     本文的研究对象是公路工程项目的风险管理,重点研究的是施工过程中的风险管理,从风险形成的因素分析、风险评价、风险模型、到风险防范对策等等。本文中还结合了重庆云阳南滨路公路工程施工的实际情况,运用风险评价方法对该工程施工风险建立风险模型,并根据专家调查法及专家评价法对风险模型进行定性分析,并根据专家反馈的定性数据进行定量数学计算,得出重庆云阳南滨路公路工程施工风险数据。并根据计算的结果给出了风险防范和改善的措施。本文最后给出了研究结论及公路施工风险管理方面的研究前景展望。
Highway engineering projects is carried out in complex natural and social environment. Then often show the following characteristics such as long construction period, more investment, highly technical demanding, complicated internal structure, and extensively external contacts and so on. Therefore, there are many uncertain factors that cannot predict in the process of implementation which often affected the smooth implementation of project. There are many risks existing in highway projects. If we treat with these risks improperly, the owners of highway engineering and construction enterprises will suffer huge loss. Accordingly, it is risk that decided a highway project is successful or not. So it is rather necessary to research on risk management about highway project in order to avoid or reduce losses by the owners of highway engineering and construction enterprises.
     Taking risk of highway project management as study object, this paper researches on the whole cycle of risk management in highway construction project, especially in construction phase. It mainly includes the analysis of risk factor, risk assessment, risk models, and risk prevention measures and so on. Combined with Chongqing Yunyang Nanbin highway construction work, this paper establishes the construction risk model by risk assessment methods and analyzes the risk model qualitatively by expert survey and evaluation method. Then it gives a mathematical calculation according to the feedback data from experts and it educes the risk data of Chongqing Yunyang Nanbin highway construction. After that, it presents the risk prevention and mitigation measures according to calculation results. Finally, this paper elicits the conclusion and expectation of the risk management in highway construction.
引文
[1]郝治斌.高速公路工程建设奉献管理问题的研究,[D],管理施工。2006,7((4):129-134
    [2]杨廷钟.公路工程风险管理系统[J],华东公路。1992.8((4):73-77
    [3]聂国才.公路工程项目风险管理的探索[J],交通标准化。2009((4):133-135
    [4]吴汉杰.浅议公路工程项目施工阶段承包商的风险[J],_科技资讯,2007,(22).
    [5]陈伟珂.工程项目风险管理[M],人民交通出版社,2008,1:1-3
    [6]秦丽.浅谈公路工程的风险管理[J],工程与建设,2006((3)262-263
    [7]初洪武.冯东梅.论中小建筑施工企业的风险管理科技和产业,2007,(10).
    [8]方智刚.浅谈公路工程项目风险管理[D],科技信息,2007(1(6):109
    [9]吕志勇.浅谈公路项目投资的风险管理[J],山东财政学院学报,2004,((6):76-78
    [10]王继凤.樊守亮.施工企业规避丁程项目风险的对策探讨[J],黄河水利职业技
    [11]高利军.浅谈公路项目的风险管理[J],山西建筑,2007,6(1(8):207-208
    [12]PMI, A guide to the project management body knowledge, Pennsylvania: Project Management Institute,2000.
    [13]Bennet P. Lientz and Kathyn P. Rea.Project management for 21st century, Third Edition, Academic Press, California,2002.
    [14]王晓东.公路工程投资项目风险分析方法研究[J],工业技术经济,2005,6((3):134-135
    [15]刘兰.公路工程合同风险管理初探[J],科学之友,2009,4(1(1):86-87
    [16]唐永红.公路工程施工项目风险管理和对策[J],2008,8(8):93-95
    [17]高旭超,公路工程项目风险管理系统模型及其应用[J],山东科技大学学报,2005,12((4):106-109
    [18]王进国.公路工程项目风险管理[J].工程项目管理与研究,2004,(3):25.
    [19]吴荣桂.王建军.施工企业面临的风险及应对措施[J]山西建筑,2007,(11).
    [20]张红军.浅谈公路工程项目风险管理[J],黑龙江交通科技,2006,((8):110-111
    [21]李娜.浅析公路工程建设中的风险管理[J],经济关注:29
    [22]陈切顺.公路工程施工的风险管理交通世界[J],2009(1(5):242-243 术学院学报,2007,(10).
    [23]邓田生.徐杰军.房地产开发项目风险管理体系设计初探[J].企业技术开发,2004,(11).
    [24]卢家仪,卢有杰.项目融资[M].北京:清华大学出版社.2002
    [25]王卓甫.工程项目风险管理理论、方法与应用[M].北京:中国水利水电出版社.2006.(7)
    [26]Baker. S, Ponniah. D., Smith. S. Risk response techniques employed currently for major projects [M]. Construction Management and Economics.1997,17:205-213
    [27]俞素平.公路工程项目的施工风险因素评估[J],经营与管理,2008((1):111113
    [28]王家远.刘春乐.建设项目风险管理[M].北京:中国水利水电出版社.知识产权出版社,2004
    [29]陈伟珂,黄艳敏.工程风险与保险[M].天津:天津大学出版社,2005,33.
    [30]Shen L. Y., Wu G. W.C., Ng C. S. K.. Risk assessment for construction joint ventures in China[J]. Journal of Construction Engineering and Management. 2001, ((1):76-81
    [31]毕雄宇,张晖.公路工程项目风险管理初探[J].
    [32]聂国才.公路工程项目风险管理的探索[J],交通标准化,2009((4):133-135
    [33]曹玉明.浅谈公路施工企业经营风险与风险防范[J].经济问题,2007,(7):1315.
    [34]王伟宏.公路工程项目风险管理初探[J].常州信息职业技术学院学报,2008,(2):17-18.
    [35]John Raftery项目管理风险分析[M].北京:机械工业出版社.2003[32]侯立新.工程风险管理的因素及其防范对策[J].建筑施工,2007,(2):14-16.
    [33]王卓甫.工程项目风险管理理论、方法与应用[M].北京:中国水利水电出版社.2006.(7)
    [36]Rahman M. M, Kumaraswamy M. M.. Joint risk management through transactionally efficient relational contracting[J]. Construction Management and Economics.2002, (20):45-54
    [37]华雪峰.公路工程项目风险管理的初步探讨[J].黑龙江交通科技,2007,(11): 29-31.
    [38]沈建明.项目风险管理[M].北京:机械工业出版社.2007.
    [39]孙浩洋.公路工程项目风险管理探讨[J].交通标准化,2008((7):119-122
    [40]高速公路丛书编委.高速公路运营管理[M].北京:人民交通出版社,2000
    [41]高旭超.公路工程项目风险管理系统模型及其应用[J].山东科技大学学报,2005.12((4):106-109
    [42]王进国.公路工程项目风险管理[J].工程项目管理与研究,2004,(3):25.
    [43]张淙皎.国内水利水电工程业主风险管理研究[J].中国水利,2003,(7)B刊:17.
    [44]学位论文陈岩.公路工程项目风险管理研究2006
    [45]Walker A. Project Management in Construction[M]. Blackwell Science.2002: 46-123
    [46]和永诚.公路工程项目管理中的风险分析与防范[J].云南现代交通,2005,6((3):65-66
    [47]秦丽.浅谈公路工程的风险管理[J].工程与建设,2006((3):262-263
    [48]王永银.工程咨询概论[M].北京:中国计划出版社,2003.
    [49]刘伊生.工程造价管理基础理论与相关法规[M].北京中国计划出版社。2003.
    [50]中华人民共和国交通部.公路工程国内招标文件范本[MJ.北京:人民交通出版社2003.
    [51]Ward, S. C, Chapman. C. B. Project Risk Management:Processes, Techniques and Insights[M]. John Wiley and Sons, Chichester.UK.1997
    [52]刘国冬.工程项目组织与管理[M].北京:中国计划出版社,2003.
    [53]Thompson. P, Perry. J. Engineering construction risks:A guide to project risk analysis and risk management[M]. Thomas Telford,London.1992
    [54]陈强.浅析我国公路工程项目管理的现状及发展对策[J].工程建设与管理:255256
    [55]学位论文袁飞云.五指山隧道工程风险管理,2007
    [56]Tarek Zayed, Assessing risk and uncertainty inherent in Chinese highway projects using AHP International Journal of Project Management 26 2008,408 - 419
    [57]Daniel L. Dornan, Asset management:remedy for addressing the fiscal challenges facing highway infrastructure, International Journal of Transport Management 1 2002,41 - 54
    [58]H. Ping Tserng, A study of ontology-based risk management framework of construction projects through project life cycle, Automation in Construction 18 2009,994 - 1008
    [59]A. S. Akintoye, M. J. MacLeod, Risk analysis and management in construction, International journal of project management 15 (1) 1997,31- 38.
    [60]A. S. Ang, D. D. Leon, Modeling and analysis of uncertainties for risk-informed decisions in infrastructures engineering, Structure and Infrastructure Engineering1 (1) 2005,19 - 31.
    [61][英]罗吉.弗兰根,乔治.诺曼.工程建设风险管理[M].北京:中国建筑工业出版社,2000
    [62]B. Mulholland, J. Christian, Risk assessment in construction schedules, Journal of construction engineering and management 125 (1) 1999,8 - 15.
    [63]I. Dikmen, M. T. Birgonul, C. Anac, J. H. M. Tah, G. Aouad, Learning from risks:a tool for post-project risk assessment, Automation in construction 18 (1) 2008,42 - 50.
    [64]I. Nonaka, The concept of'Ba':building a foundation for knowledge creation, California Management Review 40 (3) 1998,40 - 54.
    [65]J. H. M. Tah, V. Carr, Knowledge-based approach to construction project risk management, Journal of Computing in Civil Engineering 15 (3) 2001,170- 177.
    [66]J. Raftery, Risk Analysis in Project Management, E&FN SPON, New York, 1994.
    [67]卢有杰.项目风险管理[M].北京:清华大学出版社.2001
    [68]J. H. Woo, M. J. Clayton, R. E. Johnson, B. E. Flores and C. Ellis, Dynamic Knowledge Map:reusing experts' tacit knowledge in the AEC industry. Automation in construction 13(2) 2004,203 - 207.
    [69]K.J. Yi, D. Langford, Scheduling-based risk estimation and safety planning for construction projects, Journal of construction engineering and management 132 (6) 2006,626 - 635.
    [70]K. R. Nielsen, Risk management:lessons from six continents, Journal of management in engineering 22 (2) 2006,61 - 67.
    [71]N. A. Kartam, S. A. Kartam, Risk and its management in the Kuwaiti construction industry:a contractors'perspective, International journal of project management19 (6) 2001,325 - 335.
    [72]O. A. Jannadi, S. Almishari, Risk assessment in construction, Journal of construction engineering and management 129 (5) 2003,492 - 500.
    [73][美)加里.德斯勒.人力资源管理[M].北京:中国人民大学出版社,1996
    [74]Organization for Economic Co-operation and Development, The Knowledge-based Economy, Paris,1996.
    [75]P. Carrillo, P. Chinowsky, Exploiting knowledge management:the engineering and construction perspective, Journal ofManagement in Engineering 22 (1) 2006,2 - 10.
    [76]Project Management Institute (PMI), A guide to the project management body of knowledge (PMBOK guide), PMI Inc., Pennsylvania,2004.
    [77]R. V. Wyk, P. Bowen, A. Akintoye, Project risk management practice:the case of a South African utility company, International journal of project management 26 (2) 2008,149 - 163.
    [78]周士富.经济管理中的决策方法[J].经济管理.1980,(9)
    [79]R. H. Clough, C. A. Sears, S. K. Sears, Construction Project Management, 4th edR, Wiley, New York,2000.
    [80]S. Baradan, M. A. Usmen, Comparative injury and fatality risk analysis of building trades, Journal of construction engineering and management 132 (5) 2006 533-539.
    [81]姜青舫.风险度量原理[M].上海:同济大学出版社.2000
    [82]T. E. El-Diraby, C. Lima, B. Feis, Domain taxonomy for construction concepts:toward a formal ontology for construction knowledge, Journal of Computing in Civil Engineering 19 (4) 2005,394 - 406.
    [83]T. H. Davenport, L. Prusak, Working Knowledge, How Organizations Manage What They Know, Harvard Business School Press, Boston,1998.
    [84]邵国霞,曹政国.公路工程项目施工阶段承包商风险综览[J].四川建筑,2005,((6)
    [85]T. H. Davenport, S. L. Jarvenpaa, M. C. Beers, Improving knowledge work process, Sloan Management Review 37 (4) 1996,53 - 65.
    [86]T. Lyons, M. Skitmore, Project risk management in the Queensland engineering construction industry:a survey, International journal of project management 22 (1) 2004,51 - 61.
    [87]杨成忠,王淑芳.公路建设项目承包商的风险管理探讨[J].中南公路工程,2004,(1(2)
    [88]T. E. El-Diraby, J. Zhang, A semantic framework to support corporate memorymanagement in building construction, Automation in Construction 15 (4) 2006,504 - 521.
    [89]T. M. Zayed, L. M. Chang, Prototype model for build-operate-transfer risk assessment, Journal of management in engineering 18 (1) 2002,7 - 16.
    [90]Y. L. Yin, H. P. Tserng, M. D. Tsai, A model of integrating the cycle of construction knowledge flows:lessons learned in Taiwan, Automation in Construction 17 (5) 2008,536 - 549.
    [91]王长在,兰照满,张志强.公路工程项目投资控制与风险管理[J].内蒙古科技与经济2005,(4)
    [92]T. R. Gruber, A translation approach to portable ontologies, Knowledge Acquisitions (2) 1993,199 - 220.
    [93]Raftery J, Pasadilla B, Chiang YH, Hui ECM, Tang BS. Globalizationand construction industry development:implications of recent developments in the construction sector in Asia. Construction Management and Economics 1998:16:729 - 37.
    [94]王萍.工程报价的组成与编制[J].工程技术,2003,(7)
    [95]Wells J. Appropriate building technologies:an appraisal based oncase studies of building projects in Senegal and Kenya. Construction Management and Economics 1993:11:203-16.
    [96]World BankThe construction industry, issues and strategies in developing countries. Washington, DC:The World Bank;1984.
    [97]王萍.工程报价的组成与编制[J].工程技术,2003,(7)
    [98]Kumaraswamy MM. Industry development through creativeproject packaging and integrated management. Engineering, Construction and Architectural Management 1998:3:228 -37
    [99]Mellers B. A, Chang S. Representations of risk judgments [J]. Organizational Behavior and Human Decision Processes.1994, (57):167-184
    [100]王萍.工程报价的组成与编制[J].工程技术,2003,((7)
    [101]Edwards W. Behavioral decision theory[J]. Annual Review of Psychology.1991, (12):473-498
    [102]Luce R.D, Weber E. U. An axiomatic theory of conjoint expected risk[J]. Journal of Mathematical Psychology.1986, (30):188-205
    [103]张水波,何伯森.工程项目合同双方风险分担问题的探讨[J].天津大学学报(社会科学版).2003,5(3);257-261
    [104]Savage L. J. The foundations of statistics[M]. NY Wiley.1994
    [105]Von Neumann J., Morgenstern O. Theory of games and economic behavior[M]. Princeton, NJ Princeton University Press.1987
    [106]曹玉明.浅谈公路施工企业经营风险与风险防范[J].经济问题,2002,(7)
    [107]Bottelberghs PH. Risk analysis and safety policy developments in the Netherlands[J]. Journal of Hazardous Materials.2000,71(13):59-84
    [108]Okamoto K. Introduction to risk and psychology[M]. Saiensu,1992
    [109]Schoemaker, P. H. Determinants of Risk-Taking:Behavioral and Economic Views. Journal of Risk and Uncertainty 1993(6):49-73.
    [110]徐鼎.项目建设期道德风险的博弈分析研究[J].中国软科学.1999(12):81-85
    [111]Pate-Cornell, M. E., Lakats, L. M., Murphy, D. M., and Gaba, D. M. Anesthesia Patient Risk:A Quantitative Approach to Organizational Factors and Risk Management Options. Risk Analysis 1997(4),511-523.
    [112]Harsanyi J C. Utilities, preferences and substantive goods [M]. The United Nations University,1992
    [113]吕志勇.浅谈公路工程项目投资的风险管理[J].山东财政学院学报,2004,((6)
    [114]Naylor J, Pritchard R. D, Ilgen D. R. A theory of behaviour in organisations[M]. NY Academic Press.1980
    [115]Liu A. M. M., Walker A. Evaluation of Project Outcomes[J]. Construction Management and Economics.1998,16(2):209-219
    [116]王卓甫.工程项目风险管理[M].北京:中国水利水电出版社.2003
    [117]Cherns. A, Bryant. D.T. Studying the client's role in construction management [J]. Construction Management and economics.1984, (2):177-184
    [118]杨宝君.国际工程项目风险管理应研究的几个问题[J].技术经济.2003,(12):47-48
    [119]杨建平.重大工程项目风险管理研究[D].北京:国家图书馆.1996
    [120]Al-Bahar.J.F. Systematic risk management approach for construction projects [J]. Journal of Construction Engineering and Management.1990,116(3): 49-55.