建筑工程设计风险分析及管理研究
详细信息    本馆镜像全文|  推荐本文 |  |   获取CNKI官网全文
摘要
分析了建筑工程设计风险管理研究和应用现状及存在的问题,结合目前我国建筑工程设计风险管理的实际现状和特点,以建筑工程设计开展的时间顺序,提出了建筑工程设计风险识别的SPC模型。通过笔者在建筑工程设计及管理工作中的实践经验、本文问卷调查的结果及相关文献分析的结果,总结了基于SPC模型的建筑工程设计的40个风险因素,提出了建筑工程设计的前十大风险因素。对40个风险因素进行了因子分析,构建了建筑工程设计风险评估指标体系,通过运用AHP层次分析法定权和模糊综合评价方法,计算推导出了各关键风险因素的权重,得出了建筑工程设计整体风险水平和各风险因子的风险水平。通过建筑工程设计参与主体的博弈分析,从信息经济学角度分析了其风险存在的根源。本文对建筑工程设计风险管理进行了分析。在认真分析国家政策和研究相关论文的基础上,从风险规避,损失控制,风险转移,风险自留,风险预防,风险监控等方面对各个风险因素的应对措施作了详细阐述,研究了适合建筑工程设计风险管理体系的机制。
The present study situation and the existing problems currently of risk management in building engineering design are analyzed.According to the current conditions and characteristics of risk management of building engineering design in our country, the SPC model of building engineering design for risk identification with the process of building engineering design is made. Through my personal work practice, the findings of the survey and analysis of relevant literature, this dissertation summed up 40 risk factors of building engineering design by the SPC model, thus brought forward the top ten risk factors of the building engineering design. The component analysis is conducted on all the identified risk parameters,and the risk estimation index system of building engineering design is established.By applying the general fuzzy estimation method and the AHP rights-determination,the weight of each key risk factor is calculated,and the general risk level and the level of each risk component within building engineering design are gained.By Game Theory on the action of the entities of engineering design,the sources of the risks are explained basing on the Information Economics. Risk management of building engineering design is analyzed. In this dissertation, on the basis of a careful analysis of national policy and research literature,from risk elusion, loss control, risk transfer, risk retention, risk prevention and risk control, the various response measures of risk factors are elaborated,and risk management system of the building engineering design is studied.
引文
[1]申立银,俞明轩.房地产市场风险.天津:天津大学出版社,1996
    [2]王丽萍,傅湘.洪灾风险及经济分析.武汉:武汉水利电力大学出版社,1999
    [3]郭仲伟.风险分析与决策.北京:机械工业出版社,1987
    [4]Durgaprasad J、Appa Rao T V S R, Parameter interdependencies for development of KBS for risk analysis,Journal of Computing in Civil Engineering,1997,11(4)
    [5]Jamal F AI-bahar,Keith Ccrandall, Systematic risk management apporach for construction projects,Journal of Construction Engineering and Management,1990,116(3)
    [6]Mohammad A Mustafa, Jamal F AI-Bahar, Project risk assessment using the analytic hierarchy process,IEEE transactions on engineering management,1991,38(1)
    [7]张建设,钟登华.一种工程项目风险因素识别新方法—表上作业方法.洛阳大学学报,2000,4:66-69
    [8]贾宗元.当前建筑过程设计阶段项目管理的九大内容.管理工学报,2002年增刊,20-23
    [9]周宗.建筑工程项目风险的FUZZY综合评判.保险职业学院学报,2002(3):36-39
    [10]王心发,詹炳根,张炬.工程项目纵向宏观风险分析.建筑经济,2004(2):16-19
    [11]徐培德,刘明亮,董献洲.基于PRA方法的风险分析系统设计.武汉理工大学学报,2003(3):15-18
    [12]蔡依平,朱文龙,施国庆.工程项目的风险识别与控制.水利科技与经济,2004(3):20-23
    [13]王要武,孙成双.建筑项目风险分析专家系统框架研究.哈尔滨建筑大学学报,2002(5):21-24
    [14]Foad Farid、Boyer L T, Roozbeh Kangair, Reruired return on investments in construction,Journal of Construction Engineering and Management,1989,115(1)
    [15]Irem Dike mnzdoganmetal, Adecision support frame work for Project sponsors in the planning stage of build operate transfer (BOT) projects, Journal of Project Management,2000
    [16]Munholland B,Christian J, Risk assessment in construction schedules,Journal of Construction Engineering and Management,1999,125(1)
    [17]J.Berny and P.townsend, Macro simulation of project risks-a practical way forward,Int.J.Projext amanagement,1993,11(4),
    [18]J.Bowers, Data for Project risk analysis,Int.J.Project Management,1994,12,
    [19]Gray R Smith、Caryn M Bohn, Small to medium construction contingency and assumption of risk,Journal of Construction Engineering and Management,1999,125(2)
    [20]He Zhi, Risk management for overseas construction projects,International Journal of Project Management, 1995,13(4)
    [21]That JHM、Carr V, A proposal for construction project risk assessment using fuzzy logic,Construction Management and Economics,2000,18
    [22]Mob C.Ketal,Practices, barriers and benefits of risk management process in building services cost estimation, Journal of Project Management,1997
    [23]A.Chateauneuf and M.Cohen, Risk seeking with diminishing marginal utility in non-expected utility model,J.of Risk and Uncertainty,1994
    [24]阎长俊,奕世红.项目建设的风险管理及其分析方法.沈阳建筑大学学报,2005(21):26-29
    [25]郭仲伟,王永县.大型工程项目的风险分析.系统工程,1994(1):26-29
    [26]唐坤,卢玲玲.建筑工程项目风险与全面风险管理.建筑经济,2004(4):12-15
    [27]杨建平,杜端甫.项目风险的一种模糊分析方法.北京航空航天大学学报,1998(1):15-18
    [28]吴立寰.工程项目风险分析中的蒙特卡洛模拟.广东工业大学学报,2004(2):18-21
    [29]邢莉莉.建筑设计项目的风险因素识别和分析.企业家天地.2007(3):22-25
    [30]贾俊峰,梁青槐.WBS-RBS与AHP方法在土建工程施工安全风险评价中的应用.中国安全科学学报,2005(7):16-19
    [31]王学军,范如国,张松林.一种工程项目风险分析方法的探讨.技术经济,2000(6):16-19
    [32]谢英亮.基于随机过程分析的项目风险评价方法.冶金矿山设计与建设,2000(1):14-16
    [33]徐恒升,刘铁敏.工程项目的风险分析.基建优化,2005(1):12-15
    [34]叶晓苏.SOT项目承包风险的综合评价方法.重庆建筑大学学报,1997(6):36-39
    [35]乔振良.工程项目风险分析探讨.福建轻纺,1997(10):16-18
    [36]H.Kuklan, E.Erdem, F.Nasri and M.Paknejad, Project Planning and control:an enhanced PERT network, int. J. Project Management,1993,11
    [37]Y.Hong and G.Apostolakls, Condtional influence diagrams in risk management, Risk Analysis,1993,
    12
    [38]R.Gareis, Handbook of Management by Projects, MANZ, Vienna,1990,
    [39]T.Williams, Risk management, infrastruetures, int. J. Project Management,1993,11
    [40]Munns, A K.Bjeirmi. B.F, The role of project management in achieving project success, International Journal of Project Management,1996,14(2)
    [41]J.Raftery, Risk Analysis in Project Management, E&FNSPON, An imprint of Chapman & Hall, London, 1994
    [42]S.Simister, Usage and benefits of Project risk analysis and management, Int. J. Project Management,1994, 12
    [43]R.Clarke and A.Low, Risk analysis in Project Planning:a simple spreadsheet application using Monte-Carlo techniques, Project APPraisal,1993,8
    [44]Grahan、Richard, Managing the Project management proeess in Aerospace and Construction:a comparative approach, International Journal of Project Management,1999,17(1)
    [45]Raz.T, Michael.E, Use and benefits of tools for Project risk management, International Journal of Project Management,2001,19(1)
    [46]J.Yang and D.Du, APPlication of fuzzy theory to project risk management, Proceedings of the international Symposium of Industrial Management, international Academy Press,1996,
    [47]D.Hertz and H.Thomas, Risk Analysis and its Applications, John Wiley&Sons,1983,
    [48]J.Yang and D.Du,, A method of dynanic risk management in project, The Age of Project Management-China and the World, Northwestern Polytechnical University Press, Xi'an,1995
    [49]Van Groenendaal, Willem J.H.Kleijnen, JackP.C., On the assessment of economic risk:factorial design versus Monte Carlo methods, Reliability Engineering and System Safety,1997,57(1)
    [50]T.Wiliiams, Using a risk register to integrate risk management in Project definition, int. J. Project Management,1994,12
    [51]Zhi He, Risk management for overseas construction projects, International Journal of Project Management, 1995,13(4)
    [52]Scott E.Harrington.Gregory R.Nirhaus,风险管理与保险,北京:清华大学出版社,2001
    [53]Ward. StePher.ChaPman. Chris., Transforming project risk management into project uncertainty management, International Journal of Project Management,2003,21(2)
    [54]侯凤鸣,李晓东.做好建设前期工作及设计项目管理的必要性.基建优化,1999(2):36-39
    [55]孟宪海,李小燕,黄跃灵.浅析工程保险制度及其推行障碍.保险研究,2006(3):26-29
    [56]赵振宇,乌云娜,黄文杰.我国工程设计管理现状与问题问卷调查分析.建筑经济,2005(9):16-19
    [57]孔晓.探索中国工程咨询业快速发展的道路.建筑经济,2005(7):16-19
    [58]蔡静.CSWAD民用工程设计项目管理分析.电子科技大学工商管理硕士(MBA)学位论文,2005.4:61-71
    [59]孙虹,方海秋.工程咨询设计项目的质量控制与风险管理.建筑经济,2005(10):22-24
    [60]谢琳琳,傅鸿源.机遇灰色评价的政府投资项目决策风险分析.建筑经济,2005(10):21-22
    [61]边灿才.建筑工程项目风险及规避对策.施工企业管理,2002,2
    [62]林振华.现代设计院工程设计项目管理初探.林业调查规划,2003(8):13-15
    [63]胡华明.关于工程项目设计监理的思考.重庆工学院学报,2001(4):10-12
    [64]刘冰国,黄荣秋.项目风险投资的指标评价体系构建.江汉石油学院学报(社科版),2003(4):11-14
    [65]赵彪,陈志鼎.设计单位开展工程设计责任保险若干问题讨论.集团经济研究,2006(9):18-19
    [66]张桦.谈大型工程设计院的改革与发展.时代建筑,2004(1):26-29
    [67]陆跃祥,游五洋.中国企业风险管理研究.山东经济,2000(4):26-29
    [68]朱启超,陈英武,匡兴华.现代技术项目风险管理研究的理论热点与展望.科学管理研究,2005(2):16-19
    [69]王振强,刘玉杰,于九如.SCERT在大型工程项目风险分析与管理中的应用研究.经济师,2005(7):16-19
    [70]叶得平,景俊海.AHP法在风险投资项目综合评价中的应用.科技与管理,2004(5):66-69
    [71]龚兴隆.企业风险管理策略.兰州商学院学报,1999(12):23-26
    [72]李翠平,王丽.工程项目风险分析方法和应对措施.石家庄经济学院学报,2004(2):30-32
    [73]卜克明,郝建平.面向设计院的项目管理系统.工程设计CAD与智能建筑,2001(5):66-69
    [74]金德民、郑丕愕.工程项目全寿命风险管理系统的理论及其应用研究.天津大学学报,2005(4):11-14
    [75]民用工程设计质量评定标准,建设部建设字第186号文,1992
    [76]成虎.工程项目管理(第二版).北京:中国建筑工业出版社,2001
    [77]埃文斯.奥尔森,洪锡熙译.模拟与风险分析.上海:上海人民出版社,2001
    [78]蒋晓静,黄金枝.层次分析法在工程项目风险管理中应用.低温建筑技术,2005,2
    [79]王宇红.发挥项目管理在设计阶段的积极作用.工程经济,2003(10):26-29
    [80]张维迎.博弈论与信息经济学.上海:上海人民出版社,1996
    [81]路小红.信息不对称理论及其实例.情报理论与实践,2000(5):337-33
    [82]雷星晖.保险公司风险管理观念发展与产品管理创新.河北:河北人民出版社,2001
    [83]官庆.大型公用建筑设计项目风险因素分析.经济体制改革,2007(3):179-182
    [84]王丽,张成福.建筑工程招标中的信息不对称风险.经济论坛,2004(9):149
    [85]隋吉平.房地产开发中的工程设计质量管理.商业研究,2001
    [86]刘向容.信息不对称理论及其意义——对2001年度诺贝尔经济学奖的评价.新疆社科论坛,2002(1):47-49
    [87]安凡所.非对称信息下的市场——2001年诺贝尔经济学奖得主的理论及应用.南方经济,2001(12):64-65
    [88]胡宜达,沈厚才.风险管理学基础——数理方法.南京:东南大学出版社,2001
    [89]何晓群.博弈论与现代市场经济.统计教育,1995(4):33-35
    [90]仵志忠.信息不对称理论及其经济学意义.经济学动态,1997(1):66-69
    [91]旬文均.博弈论与社会经济行为分析.世界经济,1995(4):19-25
    [92]王桌甫.工程项目风险管理——理论、方法与应用.中国水利水电出版社,2003
    [93]陈芝兰,黄龙生.博弈论及其经济生活中的应用.经济问题探索,1996(7):23-24
    [94]徐治道.博弈论的基本内容及其发展取向.江苏经济探讨,1996(5):38-41
    [95]张培刚,方齐云.博弈论的应用及其展望.经济评论,1998(2):13-14
    [96]孙智.工程保险.北京:中国三峡出版社,2000
    [97]王绪瑾.保险学.北京:经济管理出版社,1999
    [98]李峰,颜哲.建筑业中工程保险应用研究.建筑管理现代化,2000(4):30-32
    [99]谢识予.经济博弈论.上海:复旦大学出版社,2003
    [100]郭家汉.建设工程设计责任保险实务.北京:知识产权出版社,2003
    [101]朱震葆.博弈论与经济学的新发展.江苏统计,1998(1):14-16
    [102]陆爱勤.国际保险.广东:华东理工大学出版社,1998
    [103]许罗丹,陈平.保险学导论.广东:中山大学出版社,1996
    [104]康玲.浅谈建筑设计风险管理相关技术.中国高新技术企业.2008(24):26-28
    [105]单宝艳,王光盈.基于AHP-Fuzzy的工程建筑设计风险综合评价.工程设计学报.2008(04):15-17
    [106]冯刚,谭跃虎.建筑工程风险与我国的工程保险.建设监理,1999(6):46-48
    [107]马英健,杨贵金,田杰芳.对设计单位风险管理的探讨.建筑设计管理.2003(3):16-19
    [108]潘鹏程,潘鹏云.工程项目设计方职业风险与职业责任分析.建筑设计管理.2006(5):15-17
    [109]单宝艳,张军.工程给排水设计风险的模糊层次综合评价.建筑经济2007(S2):16-18
    [110]]王增民.因子分析法在企业经济效益的综合分析与评价中的应用.数理统计与管理,2002(2):10-13
    [111]单宝艳,王振波.基于层次模糊法的建筑工程暖通空调设计风险综合评价.中国勘察设计.2008(6):16-18
    [112]胡振华,袁静.企业效益评价因子分析模型及应用.中国管理科学,2002(10):68-70
    [113]王来生,候云先.博弈论在企业管理中的应用.数理统计与管理,2000(4):25-28

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700