摘要
鄂北水资源配置工程施工线路总长269.67km,工程多由隧洞、暗涵组成,施工期间工程沿线通信不畅。为进一步解决好施工期的安全、质量及进度管理问题,提高施工期建设管理水平,充分利用城镇公用闲置宽带,通过无线网桥和上行链路通信传输方式,实现施工期全线全标段全天候的施工期视频监控。该方式节约了投资,提高了工程管理效率。
The total length of the construction line of the water resources allocation project in northern Hubei is 269.67 km. The project layout is mostly composed of tunnels and hidden culverts. The communication along the project is not smooth during the construction. How to make full use of the urban public idle broadband is introduced in the paper in order to further resolve problems of safety, quality and schedule management during the construction, improve the level of construction management during the construction, wireless bridge and uplink communication transmission mode are implemented to realize all-weather video monitoring during construction period for the whole construction bid. The mode saves investment, and improves the efficiency of the engineering management.