引文
[1]董胜宪,罗树青.垂直顶升法在电厂取排水隧道工程中的应用[J].电力勘测设计,2012,(6):47-51,69.
[2]PECK R B.Deep excavations and tunneling in soft ground[C]//The7th International Conference on Soil Mechanics and Foundation Engineering.Mexico:[s.n.],1969.
[3]LOGANATHAN N,POULOS H G.Analytical prediction for tunneling-induced ground movement in clays[J].Journal of geotechnical and geoenvironmental engineering,1998,124(9):846-856.
[4]ATTEWELL P B.Ground movements caused by tunnelling in soil[C]//Proc.Conf.on Large Ground Movements and Structures,Cardiff.London:Pentech Press,1978.812-948.
[5]魏纲,黄志义,徐日庆,等.顶管施工引起地面变形的计算方法研究[J].岩石力学与工程学报,2005,24(s2):5808-5815.
[6]阳军生,刘宝琛.城市隧道施工引起的地表移动及变形[M].北京:中国铁道出版社,2002.
[7]LITWINSZYN J.Fundamental principles of the mechanics of stochastic medium[C]//Proc.of 3 Conf.Theo.Appl.Mech.,Bongalore,India,1957.
[8]施成华,黄林冲.顶管施工隧道扰动区土体变形计算[J].中南大学学报(自然科学版),2005,36(2):323-328.
[9]龚尚龙,杨转运,陈思甜.采用随机介质理论分析超浅层曲线顶管施工引起的地表沉降[J].重庆交通学院学报,2005,24(6):95-98.
[10]乔宏伟,邓志辉.顶管施工中地面沉降的预测[J].西部探矿工程,2000(6):113-114.
[11]罗筱波,周健.多元线性回归分析法计算顶管施工引起的地面沉降[J].岩土力学,2003,24(1):130-134.
[12]方从启,孙钧.浅层顶管施工引起的土体移动[J].岩土力学,2000,21(1):36-41.
[13]方从启,李向红.浅层顶管施工引起地面沉降的预测[J].江苏大学学报(自然科学版),1999,20(6):5-8.
[14]冯海宁,温晓贵,魏纲,等.顶管施工对土体影响的现场试验研究[J].岩土力学,2003,24(5):781-785.
[15]周顺华,廖全燕,刘建国,等.矩形顶管隧道顶进过程的地层损失[J].岩石力学与工程学报,2001,20(3):342-345.
[16]MINDLIN R D.Force at a point in the interior of a semi-infinite solid[J].Physics,1936,7(5):195-201.
[17]魏纲,张世民,齐静静,等.盾构隧道施工引起的地面变形计算方法研究[J].岩石力学与工程学报,2006,25(s1):3317-3323.
[18]魏纲,魏新江,徐日庆.顶管工程技术[M].北京:化学工业出版社,2011.
[19]齐静静,徐日庆,魏纲.盾构施工引起土体三维变形的计算方法研究[J].岩土力学,2009,30(8):2442-2446.
[20]阳军生,刘宝琛,阳生权.竖井建设引起的地表移动及变形[J].岩石力学与工程学报,1999,18(3):291~293.
[21]阳军生,刘宝琛.沉桩引起的临近地表移动及变形[J].工程勘察,1999(3):1-3.