摘要
围绕安庆市区西部高铁新区建设紧迫需求,在充分收集整合以往地质工作的基础上,通过大比例尺工程地质调查,评价了场地稳定性、建设场地适宜性及地下空间开发利用难度大小,提出不同深度地下空间开发的主要制约问题,从建筑布局、基础选型及基坑工程等3个方面提出了地学建议,为安庆高铁新区建设提供技术支撑。
For the urgent needs in construction of the Gaotie(high-speed rail) New District in western Anqing urban area, on the basis of full collection and integration of previous geological work data, through large scale engineering geological investigation, this paper evaluates the site stability, construction site suitability and the difficulty in underground space development and utilization, puts forward the main problems confining the development of underground space in different depth, gives geological suggestions on three aspects of architectural layout, selection of foundation type and foundation pit engineering, thus providing technical support for the construction.
引文
[1]程光华.中国城市地质调查工作指南[M]北京:科学出版社,2013.
[2]花修权,黄敬军,魏永耀.江苏徐州市城市地质调查需求分析及关键问题[J].地质学刊,2015(6):322~327.