引文
[1]C Tang,T W J van Asch,M Chang,et al.Catastrophic debris ows on13 August 2010 in the Qingping area,southwestern China:The com-bined effects of a strong earthquake and subsequent rainstorms[J].Geomorphology,2011,(18):1-17
[2]Yu Bin.Study on the mean velocity of viscous debris flows[J].Ad-vances in Earth Science,2008,23(5):524-532
[3]Zhuang Jianqi,Cui Peng1,Hu kaiheng,et al.Research on debris flowinitiation due to bed failure after Wenchuan Earthquake[J].Journalof Sichuan University:Engineering Science Edition,2010,(5):231-235[庄建琦,崔鹏,胡凯衡,等.沟道松散物质起动形成泥石流实验研究[J].四川大学学报:工程科学版,2010,(5):231-235]
[4]Emmanuel J Gabet,Simon M Mudd.The mobilization of debris flowsfrom shallow landslides[J].Geomorphology,2006,(74):207-218
[5]Zhang Ming1,Hu Ruilin,Yin Yueping,et al.Study of transformmechanism of landslides-debris flow with ring shear text[J].ChineseJournal of Rock Mechanics and Engineering,2010,(4):822-832[张明,胡瑞林,殷跃平.滑坡型泥石流转化机制环剪试验研究[J].岩石力学与工程学报,2010,(4):822-832]
[6]He Wenshe,Cao Shuyou,Liu Xingnian,et al.Critical shear stress ofincipient motion of sediment[J].Acta Mechanica Sinica,2003,(3):326-331[何文社,曹叔尤,刘兴年,等.泥沙起动临界切应力研究,力学学报[J].2003,(3):326-331]
[7]He Wenshe,Cao Shuyou,Yuan Jie,et al.Incipient motion of non-u-niform sediment particles on sloping fluvial beds[J].Journal of Hy-droelectric Engineering,2004,(4):78-87[何文社,曹叔尤,袁杰.斜坡上非均匀沙起动条件初探[J].水力发电学报,2004,(4):78-87]
[8]Xie Renzhi,Cheng Zhujun.The formula of strong nonlinear logarithmflood peak reasoning[J].Journal of China Hydrology,1988,(4):21-23[谢任之,程祖均.非线性对数雨强公式的洪峰推理公式计算[J].水文,1988,(4):21-23]
[9]Liang Guangmo,Yaolingkan.Sure rainstorm debris flow of the criticalrainfall[J].Subgrade Engineering,2008,(6):3-4[梁光模,姚令侃.确定暴雨泥石流临界雨量的研究[J].路基工程,2008,(6):3-4]
[10]Qi Xing,Yu Bin,Ma Yu,et al.Characteristics of Longchi 8.13 Ma-liu gully debris flow disasters of in Dujiangyan,Sichuan Province[J].The Chinese Journal of Geological Hazard and Control,2011,(22):17-21[亓星,余斌,马煜,等.四川省都江堰龙池8.13麻柳沟泥石流灾害特征[J].中国地质灾害与防治学报.2011,(22):17-21]
[11]Ma Yu,Yu Bin,Wu Yufu,et al.Research on the disaster of debrisflow of Bayi Gully,Longchi,Dujiangyan,Sichuan on August 13,2010[J].Journal of Sichuan University:Engineering Science Edi-tion,2011(43),92-92[马煜,余斌,吴雨夫,等.四川都江堰龙池“8.13”八一沟大型泥石流灾害研究[J].四川大学学报,工程技术版,2011(43),92-92]
[12]Zhushoumin.Soil mechanics(second edition)[M].China Architec-ture&Building Press,2005:86-105[朱首明.土力学(第二版)[M].中国建筑工业出版社.2005:86-105]
[13]Li Jixiang,Peng Shusheng,Zhao Sanqing,et al.Critical erosion gra-dient of freeway cutting slope[J].Journal of Liaoning Technical U-niversity:Natural Science,[2009,(28):56-58李继祥,彭书生,赵三青.高速公路路堑边坡的侵蚀临界坡度[J].辽宁工程技术大学学报:自然科学版,2009,(28):56-58]
[14]Liu Beili,She Xuesen,Yu Wei.Optimizing Analysis of calculationmethod for runoff amount on loess slope[J].Journal of Water Re-sources and Architectural Engineering,2006,(4):60-63[刘倍利,折学森,于伟.黄土坡面径流量计算方法的优化分析[J].水利与建筑工程报.2006,(4):60-63]
[15]Zhang Xiaona,Feng Jie,Gao Yongbo,et al.Influences of slope onrunoff and concentration and solute transport under different rainfallintensities[J].Bulletin of Soil and Water Conservation,2010,(30):119-123[张小娜,冯杰,高永波.不同雨强条件下坡度对坡地产汇流及溶质运移的影响[J].水土保持通报.2010,(30):119-123]
[16]He Siming,Wu Yong,Li Xinpo.Research on eroded start mecha-nism of channel debris flow[J].Rock and Soil Mechanics,2007,(28):155-159[何思明.黏性泥石流沟道侵蚀启动机制研究[J].岩土力学.2007,(28):155-159]
[17]Chen Yizhi,Zhuang Xicheng.Preliminary Approach to the solutionfor the Kinematic Wave of saturation overland flow[J].Journal ofFuzhou University:Natural Sciences Edtion,1987,(3):55-61[陈异植,庄希澄.饱和坡面流运动波解初探[J].福州大学学报:自然科学版,1987,(3):55-61]
[18]Jin Changxing.A theoretical study on critical erosion slope gradient[J].Acta Geographica Sinica,1995,(50):234-239[靳长兴.论坡面侵蚀的临界坡度[J].地理学报.1995,(50):234-239]
[19]Tian Kai,Li Xiaoqing,Shen Zhenzhou,et al.Experimental study onhydraulic characteristic of shallow flow under dDifferent bed materi-al[J].Journal of Soil and Water Conservation,2010,(24):70-73[田凯,李小青,申震洲,等.不同床沙下的坡面流水力学特性试验研究[J].水土保持学报.2010,(24):70-73]
[20]Sichuan Geological Engineering Survey Court.Emergency explora-tion report shuida gully,Dujiangyan[R].2010[四川省地质工程勘察院.都江堰市龙池镇水打沟泥石流应急勘查报告[R].2010]
[21]Pia Rosella Tecca,Rinaldo Genevois.Field observations of the June30,2001 debris flow at Acquabona(Dolomites,Italy)[J].Land-slides,2009,(6):39-45
[22]Matteo Berti,Rinaldo Genevoisb,Alessandro Simoni.Field obser-vations of a debris flow event in the Dolomites[J].Geomorphology,1999,(29):265-274
[23]Yu Bin.Research on the calculating density by the deposit of debrisflows[J].Acta Sedimentologica Sinica,2008,(26):789-796[余斌.根据泥石流沉积物计算泥石流重度的方法研究[J].沉积学报,2008,(26):789-796]