堰塞湖除险工程施工设备保障分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
堰塞湖除险工程时间紧、施工强度高、道路阻塞,施工设备应急保障是堰塞湖除险成功的关键。文中主要介绍了施工设备的选型、配套、筹措、检修、输送和处置等方法。
The emergency support of construction equipment is the key-link of the success of the risk-elimination project of landslide dam,as the construction time is limited with a high construction intensity under the condition of cut-off of the road concerned;for which the selection,matching,preparation,maintenance,transportation and disposition of the relevant equipments are introduced herein.
引文

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700