引文
[1]顾淦臣,束一鸣,沈长松.土石坝工程经验与创新[M].北京:中国水利水电出版社,2004.(GU Gan-chen,SU Yi-ming,SHEN Chang-song.Experiences and innovations of earth-rockfill dam engineering[M].Beijing:China Water Power Press,2004.(in Chinese))
[2]王柏乐.中国当代土石坝工程[M].北京:中国水利水电出版社,2004.(WANG Bo-le.Modern Earth-rockfill Dams in China[M].Beijing:China Water Power Press,2004.(in Chinese))
[3]潘家铮,何璟.中国大坝50年[M].北京:中国水利水电出版社,2000,9.(PAN Jia-zheng,HE Jing.Large dams in China(a fifty year review)[M].Beijing:China WaterPower Press,2000,9.(in Chinese))
[4]林昭.土石坝设计应重视工程实践经验[J].水利水电工程设计,2005,24(2):1–2.(LIN Zhao.Extra attention to be paid on engineering practice and experience in design of the earth-rockfill dam[J].Design of Water Resourses&Hydroelectric Engineering,2005,24(2):1–2.(in Chinese))
[5]尹力峰,唐丽华,王海涛,等.克孜尔水库大坝的地震动力反应分析[J].世界地震工程,2002,18(4):165–172.(YIN Li-feng,TANG Li-hua,WANG Hai-tao,et al.Seismic response analysis of Kezier reservoir dam[J].World Earthquake Engineering,2002,18(4):165–172.(in Chinese))
[6]曲延军,李志海,杨成荣.2005年9月新疆克孜尔震群活动特征分析与震后趋势判定[J].内陆地震,2007,21(1):19–27.(QU Yan-jun,LI Zhi-hai,YANG Cheng-rong.The Characteristic analysis of earthquake swarm activity of Xinjiang Kezier in Sep.2005 and the tendency determination after the earthquake[J].Inland Earthquake,2007,21(1):19–27.(in Chinese))
[7]邓铭江,周小兵,石泉,等.“635”水利枢纽大坝心墙防渗土料工程特性及防渗结构设计[J].新疆水利,2000(5):5–13.(DENG Ming-jiang,ZHOU Xiao-bing,SHI Quan,et al.Engineering characteristic of anti-seepage materials for core wall“635”multipurpose dam and its anti-seepage design[J].Xinjiang Water Resources,2000(5):5–13.(in Chinese))
[8]唐新军,凤家骥,凤炜.“635”水利枢纽黏土心墙坝反滤料特性分析与试验研究[J].武汉大学学报(工学版),2002,35(2):5–9.(TANG Xin-jun,FENG Jia-ji,FENG Wei.Analysis of ECRD's filter characteristic and study on experiment of"635"multipurpose dam project[J].Engineering Journal of Wuhan University,2002,35(2):5–9.(in Chinese))
[9]阿不力米提,曲苓.恰甫其海黏土心墙坝的材料选择及结构设计[J].水利技术监督,2008(4):52–54.(ABULIMITI,QU Ling.Selection and structural design of material clay core wall dam of qiapuqihai water conservancy multipurpose project[J].Technical Supervision in Water Resources,2008(4):52–54.(in Chinese))
[10]邓铭江,周小兵,万金平,等.“635”水利枢纽大坝心墙防渗土料分散性[J].岩土工程学报,2000,22(6):673–677.(DENG Ming-jiang,ZHOU Xiao-bing,WAN Jin-ping,et al.Dispersion appraisal and modification analyses of the impervious soil materials for the core wall of the dam of“635”water control project[J].Chinese Journal of Geotechnical Engineering,2000,22(6):673–677.(in Chinese))
[11]陈生水,凤家骥,袁辉.砂砾石面板坝关键技术研究[J].岩土工程学报,2004,26(1):16–20.(CHEN Sheng-shui,FENG Jia-ji,YUAN Hui.Research on key techniques of facing sandy gravel dam[J].Chinese Journal of Geotechnical Engineering,2004,26(1):16–20.(in Chinese))
[12]汪洋,曲苓.乌鲁瓦提砂砾石面板高坝渗流控制的设计[J].水利水电技术,2000,31(1):66–70.(WANG Yang,QU Ling.Seepage control design for wuluwati dam[J].Water Resources and Hydropower Engineering,2000,31(1):66–70.(in Chinese))
[13]彭卫军,范金勇.吉林台一级水电站混凝土面板砂砾石一堆石坝坝体抗震设计[J].水力发电,2006,32(6):26–28.(PENG Wei-jun,FAN Jin-yong.The seismic design of the CF dam of Jilintai-Ⅰhydropower station[J].Water Power,2006,32(6):26–28.(in Chinese))
[14]唐懿.吉林台一级水电站面板堆石坝混凝土面板施工[J].水力发电,2006,32(6):40–43.(TANG Yi.Construction of concrete faced rock-fill dam of Jilintai-Ⅰhydropower station[J].Water Power,2006,32(6):40–43.(in Chinese))
[15]唐新军,凤炜,凤家骥,等.榆树沟水库枢纽工程的设计特点与运行情况[J].新疆农业大学学报,2004,27(2):52–56.(TANG Xin-jun,FENG Wei,FENG Jia-ji,et al.Design character and circulation situation of yushugou reservoir pivot project[J].Journal of Xinjiang Agricultural University,2004,27(2):52–56.(in Chinese))
[16]鲁一晖,郝巨涛,赵波,等.吉林台电站混凝土面板坝周边缝自愈型止水结构[J].水力发电,2005,31(1):42–54.(LU Yi-hui,HAO Ju-tao,ZHAO Bo,et al.Research on self-healing waterstop of perimeter joint of Jilintai-I CFRD[J].Water power2005,31(1):42–54.(in Chinese))
[17]朱晟,闻世强.当代沥青混凝土心墙坝的进展[J].人民长江,2004,35(9):9–11.(ZHU Sheng,WEN Shi-qiang.Present-day progress of asphalt concrete core wall dam[J].Yangtze River,2004,35(9):9–11.(in Chinese))
[18]郝巨涛,刘增宏.水工沥青混凝土防渗技术.In:中国大坝委员会.中国大坝技术发展水平与工程实例[M].北京:中国水利水电出版社,2007,12:186–192.(HAO Ju-tao,LIU Zeng-hong.Anti-seepage technique for asphalt concrete in hydraulic engineering:China Hydropower Commission.China Hydropower technique and its engineering cases[M].Beijing:China Water Power Press,2007,12:186–192.(in Chinese))
[19]M.邓斯坦.2008年世界RCC坝纵览[J].水利水电快报,2009,30(6):23–25.(DENGSITAN M.2008 World prospectives of RCC dams[J].Express Water Resources&Hydropower Information,2009,30(6):23–25.(in Chinese))
[20]余丕玉.光照水电站碾压混凝土坝施工期温度控制措施[J].企业科技与发展,2009(10):120–123.(YU Pi-yu.Some temperature control measures during the construction of gravity dam for Guangzhao hydropower station[J].Enterprise Science and Technology&Development,2009(10):120–123.(in Chinese))
[21]沈崇刚.中国碾压混凝土坝技术的进展与运行经验[J].水力发电,1999(10):43–46,69.(SHEN Chong-gang.Technological advance and operation experience of RCC dam in China[J].Water Power,1999(10):43–46,69.(in Chinese))
[22]朱伯芳.当前混凝土坝建设中的几个问题[J].水利学报,2009,40(1):1–9.(ZHU Bo-fang.On some problems in construction of concrete dams[J].Journal of Hydraulic Engineering,2009,40(1):1–9.(in Chinese))
[23]阮新民,夏世法,鲁一晖,等.寒冷地区某RCC重力坝保温措施及效果分析[J].南水北调与水利科技,2009,7(3):27–30.(RUAN Xin-min,XIA Shi-fa,LU Yi-hui,et al.Application and effect evaluation for the heat preservation measures of a rcc gravity dam in cold region[J].South-to-North Water Transfers and Water Science&Technology,2009,7(3):27–30.(in Chinese))
[24]罗伟邦,刘涛,刘君.喀拉塑克重力坝应力应变分析及体型优化[J].东北水利水电,2007,25(12):1–2.(LUO Wei-bang,LIU tao,LIU Jun.Stress analysis and dam body optimization of Kelasuke gravity dam[J].Water Resources&Hydropower of Northeast China,2007,25(12):1–2.(in Chinese))
[25]牛万吉,王建平,罗清萍,等.严寒干旱地区RCC重力坝的保温防裂措施[J].水利水电科技进展,2009,29(1):44–46.(NIU Wan-ji,WANG Jian-ping,LUO Qing-ping,et al.Research on the heat preservation and crack-prevention measures for RCC gravity dam in severly cold and dry area[J].Advances in Science and Technology of Water Resources,2009,29(1):44–46.(in Chinese))
[26]杨长征,曹伟,范金勇,等.严寒地区碾压混凝土坝施工技术及仿真[M].北京:科学出版社,2009,11.(YANG Chang-zheng,CAO Wei,FAN Jin-yong,et al.Construction technique and its simulation of roller concrete dam in severe cold area[M].Beijing:Science Press,2009,11.(in Chinese))
[27]李世新,杨长征,杜彬,等.新疆山口水电站混凝土拱坝保温保湿方案分析[J].水力发电学报,2008,27(3):43–47.(LI Shi-xin,YANG Chang-zheng,DU Bin,et al.Analysis of heat and moisture insulation schemes for a concrete dam of Shankou hydropower station in Xinjiang Province[J].Journal of Hydroelectric Engineering,2008,27(3):43–47.(in Chinese))
[28]胡新丽,董芸,黄成显.石灰石粉与粉煤灰双掺在山口水电站碾压混凝土中应用的施工特性[J].粉煤灰,2009,21(5):22–25.(HU Xin-li,DONG Yun,HUANG Cheng-xian.Construction features on application of limestone powder in rolled concrete for shankou hydroelectric station[J].Coal Ash China,2009,21(5):22–25.(in Chinese))
[29]肖开涛,董芸,杨华全.石灰石粉用在碾压混凝土掺和料的试验研究[J].长江科学院院报,2009,26(4):44–47.(XIAO Kai-tao,DONG Yun,YANG Hua-quan.Test study of limestone powder mixed in RCC[J].Journal of Yangtze River Scientific Research Institute,2009,26(4):44–47.(in Chinese))
[30]刘光廷,徐增辉,李鹏辉.柔性拱和软弱地基上的碾压混凝土拱坝[J].清华大学学报(自然科学版),2002,42(10):1365–1368.(LIU Guang-ting,XU Zeng-hui,LI Peng-hui.Flexible RCC arch dam on a weak foundation[J].Journal of Tsinghua university(Science and Technology),2002,42(10):1365–1368.(in Chinese))
[31]刘光廷,胡昱,王恩志,等.石门子碾压混凝土拱坝温度场实测与仿真计算[J].清华大学学报(自然科学版),2002,42(4):116–119.(LIU Guang-ting,HU Yu,WAN En-zhi,et al.Analysis and measurement of the temperature field in the Shimenzi RCC arch dam[J].Journal of Tsinghua university(Science and Technology),2002,42(4):116–119.(in Chinese))
[32]杨海林.深厚覆盖层基础上堆石坝防渗系统优化研究[D].南京:河海大学,2007:6–7.(YANG Hai-lin.Study on Anti-seepage System Optimization for Rock-fill dam on the Basement of Deep Overburden Layer[D].Nanjiang:Hohai University,2007:6–7.(in Chinese))
[33]赵明华,陆希.西藏部分电站深厚覆盖层渗控体系综述及优化初探[J].西北水电,2009,28(2):34–38.(ZHAO Ming-hua,LU Xi.Summary and optimization study of seepage control system for deep overburden in some hydropower projects in Tibet[J].Northwest Water Power,2009,28(2):34–38.(in Chinese))
[34]关艳平,薛建军.冶勒水电站深厚覆盖层帷幕灌浆试验研究[J].四川水利,2006(4):73–76.(GUAN Yan-ping,XUE Jiang-jun.Experiment of curtain grouting for deep overburden layer at Yele hydropower station[J].Sichuan Water Conservancy,2006(4):73–76.(in Chinese))
[35]韩军,黄小宁.新疆下坂地水利枢纽坝基深厚覆盖层防渗措施试验研究[J].水利水电技术,2005,36(7):64–67.(HAN Jun,HUANG Xiao-ning.Study on anti-seepage treasures experiment on basement of deep overburden layer at Xiabandi project,Xinjiang[J].Water Resources and Hydropower Engineering,2005,36(7):64–67.(in Chinese))
[36]王根龙,崔拥军,寿立勇,等.新疆下坂地水利枢纽坝基垂直防渗试验研究[J].人民长江,2006(6):59–61.(WANG Geng-long,CUI Yong-jun,SHOU Li-yong,et al.Test and study on vertical seepage control of dam foundation of Xiabandi hydroproject in Xinjiang Uygur Autonomous Region[J].Yangtze River,2006(6):59–61.(in Chinese))