摘要
通过实地调查,基本对全省地质工作项目钻探工程质量总体情况有了全面掌握,对待存在问题,认为钻探队伍建设是关键,其次是从不同层次加强质量管理,从三级质量管理制度上严格要求,同时应提高质量意识。
Based on spot survey, which disclosed overall conditions of drilling quality of geological projects in the whole province, it is suggested that drilling team construction is the key to solving existing issues, quality management should be strengthened at different levels, three-level quality management system strictly followed and quality awareness improved.
引文
目录