路线交叉处既有公路路基改桥梁设计探讨
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Discussion on design of existing subgrade to bridge at intersection of routes
  • 作者:孙志刚 ; 孙绪锋 ; 刘世臣
  • 英文作者:SUN Zhi-gang;SUN Xu-feng;LIU Shi-chen;Shandong Provincial Communications Planning and Design Institute;
  • 关键词:路基改桥梁 ; 保通措施 ; 结构设计 ; 施工工序
  • 英文关键词:the existing subgrade being changed into a bridge;;guaranteed access measures;;structure design;;construction procedure
  • 中文刊名:JTKE
  • 机构:山东省交通规划设计院;
  • 出版日期:2019-06-25
  • 出版单位:山东交通科技
  • 年:2019
  • 期:No.172
  • 语种:中文;
  • 页:JTKE201903031
  • 页数:3
  • CN:03
  • ISSN:37-1276/U
  • 分类号:117-119
摘要
新建公路与既有公路交叉时,如遇既有公路路基填土高度较高,具备新建公路下穿既有公路条件时,可采用既有公路路基改桥梁方案。主要介绍了既有公路路基改桥梁方案的保通措施、上下部结构设计及施工工序等。
        When a new road route crosses an existing road route, the existing Subgrade can be changed into a bridge if the height of the existing Subgrade is relatively high and the conditions for the new road route undercrossing the existing road route are met. This paper mainly introduces the guaranteed access measures, superstructure and substructure design and construction procedure of the existing Subgrade being changed into a bridge.
引文
[1]JTG D63-2007,公路桥涵地基与基础设计规范[S].
    [2]关昌余,丽萌,陈胜营.新理念公路设计指南[M].北京:人民交通出版社,2005.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700