摘要
"华龙一号"是由中国两大核电企业中国核工业集团公司和中国广核集团共同研发的先进百万千瓦级压水堆核电技术。在核电厂外部交流电源全部失去的条件下,每套柴油发电机组将满足应急厂用设备的用电要求,确保反应堆安全停堆。制造活动开始前,识别设备制造质量控制的主要风险、并采取相应的控制措施,将对应急柴油发电机组的设备整体质量、核电厂的安全运行至关重要。
HPR1000 was jointly developed by the two nuclear power companies that China National Nuclear Corporation and China Chinese Guangdong Nuclear Power Group advanced million kilowatt pressurized water reactor nuclear power technology. Under the condition that all the external AC power sources of the nuclear power plant are all lost, each set of diesel generating sets will meet the power requirements of emergency plant equipment, and ensure the reactor safety shutdown. Before starting manufacturing activities, identifying the main risks of equipment manufacturing quality control and taking corresponding control measures will be critical for the overall quality of emergency diesel generator sets and the safe operation of nuclear power plants.
引文
[1]杨发慧,等.12PC2-6B应急柴油发电机组国产化研制[J].中国核电,2017(04):505-512.
[2]刘海良.核电站应急柴油发电机组的特点分析及调试方法[J].通讯世界,2017(08):140-141.
[3]宋金良,李惠玲.1E级应急柴油发电机组项目质量管理及经验反馈[J].城市建设理论研究,2016(29):28-29.
[4]袁育龙,等.核电站应急柴油发电机组缸套异常磨损分析与改进[J].柴油机,2016(02):54-57.
[5]姜燕成,关震.核电厂柴油机低温水泵入口管道裂纹故障处理与分析[J].自动化与仪器仪表,2015(03):63-64.
[6]维邦华.核级应急柴油机的国产化方案[J].中国核电,2014(02):104-108.