院基寺水库新设取水口工程运行对溢洪道影响研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on the Influence of New Water Intake Project on the Spillway of Yuanjisi Reservoir
  • 作者:曲晓阳 ; 肖宜 ; 王均星 ; 张勇超 ; 郭星锐
  • 英文作者:QU Xiao-yang;XIAO Yi;WANG Jun-xing;ZHANG Yong-chao;GUO Xing-rui;State Key Laboratory of Water Resources and Hydropower Engineering science Wuhan University;Hubei Provincial Water Security Collaborative Innovation Center;
  • 关键词:院基寺水库 ; 取水口工程 ; 溢洪道 ; 工程安全论证 ; 流场 ; 渗流分析
  • 英文关键词:Yuanjisi Reservoir;;water intake project;;spillway;;engineering safety demonstration;;flow field;;seepage analysis
  • 中文刊名:ZNSD
  • 英文刊名:China Rural Water and Hydropower
  • 机构:武汉大学水资源与水电工程科学国家重点实验室;水资源安全保障湖北省协同创新中心;
  • 出版日期:2019-07-15
  • 出版单位:中国农村水利水电
  • 年:2019
  • 期:No.441
  • 语种:中文;
  • 页:ZNSD201907027
  • 页数:7
  • CN:07
  • ISSN:42-1419/TV
  • 分类号:138-143+151
摘要
武汉市北部黄陂区前川城区因城市发展需要,拟在院基寺水库增设取水口。由于工程选址在水库溢洪道附近,为分析取水口建成运行对溢洪道的影响,分别从工程建设前后溢洪道泄流能力变化和工程运行时溢洪道边坡渗流稳定两个方面进行研究,采用Flow 3D软件对工程建设前后不同泄流工况的流场进行建模并对比分析,应用Geo studio软件选取2处不利断面进行了边坡渗流稳定分析,结果表明工程建设前后溢洪道泄流流量变化小于1%且工程对泄流流场影响可忽略不计;若发生管道渗漏,溢洪道边坡最大水力坡降在规范允许范围内,且工程建设对溢洪道边坡渗流稳定影响较小,研究成果可供类似工程应用参考。
        Due to the need of economic development,Qianchuan of Huangpi District,north of Wuhan City,a new water intake at Yuanjisi Reservoir is proposed because the site selection of the project is near the spillway of the built reservoir. In order to analyze the influence of water intake construction and operation on spillway,this paper discusses the change of spillway discharge capacity before and after construction and slope seepage stability respectively. Flow 3D software for modeling and comparative analysis of the flow field of different discharge conditions is used before and after engineering construction,and Geo studio software is used to select 2 adverse sections for modeling and seepage analysis. And the results show that the change of spillway discharge rate before and after construction is less than 1%and the influence of flow field can be ignored. Besides,if pipe leakage happened,the largest hydraulic slope of the spillway slope was within the allowable range of the code and construction has little influence on the stability of the spillway seepage. This paper can be used as a reference for similar engineering applications.
引文
[1]陈位洪,赵世海.西江引水工程穿越北江大堤管道工程对大堤的影响分析[J].特种结构,2009,26(5):95-99.
    [2]王梅霞,郝菊红.热力管道穿越渭河堤防工程方案论证[J].陕西水利,2014(4):75-76.
    [3]涂国祥,黄润秋.某电站溢洪道边坡运行期地下水渗流场特征数值模拟[J].地球与环境,2005,33(3):145-149.
    [4]SL285-2003,水利水电工程进水口设计规范[S].
    [5]DL/T 5353-2006,水电水利工程边坡设计规范[S].
    [6]李玲,陈永灿,李永红.三维VOF模型及其在溢洪道水流计算中的应用[J].水力发电学报,2007(2):83-87.
    [7]魏玉虎,许模,曹宁.长江三峡工程奉节库岸边坡地下水渗流流场模拟分析[J].四川地质学报,2003,23(1):18-22.