长壁逐胶结充填采充工艺协调优化设计方法
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:A Design Method for Coordinated Optimization for Mining and Filling Process of Longwall-roadway with Cemented Backfilling Technology
  • 作者:孙凯 ; 曹鑫 ; 武中亚 ; 宋卫剑
  • 英文作者:SUN Kai;CAO Xin;WU Zhongya;SONG Weijian;State Key Laboratory of Coal Resources and Safe Mining,China University of Mining and Technology;School of Mines,China University of Mining and Technology;
  • 关键词:长壁逐开采 ; 胶结充填 ; 工艺协调 ; 优化设计
  • 英文关键词:Longwall-roadway backfilling mining;;Cemented backfilling;;Process coordination;;Optimization design
  • 中文刊名:KYYK
  • 英文刊名:Mining Research and Development
  • 机构:中国矿业大学煤炭资源与安全开采国家重点实验室;中国矿业大学矿业工程学院;
  • 出版日期:2019-06-25
  • 出版单位:矿业研究与开发
  • 年:2019
  • 期:v.39;No.227
  • 基金:中央高校基本科研业务费项目(2017XKZD13)
  • 语种:中文;
  • 页:KYYK201906003
  • 页数:6
  • CN:06
  • ISSN:43-1215/TD
  • 分类号:15-20
摘要
针对目前长壁逐胶结充填开采技术采充协调作业中存在的技术难点,基于理论分析与实践经验,推导出了两间隔道数目、一组同时充填道数目和一个循环采充道组数等采充工艺协调关键参数的计算公式,并由此提出了一种长壁逐胶结充填采充工艺协调优化的设计方法,为提高充填工作面的生产效率、指导现场实践提供了理论支撑。以陕西榆林市榆阳区金牛煤矿为工程背景,对该优化设计方法的实施做了进一步的说明,证明了长壁逐胶结充填采充工艺协调优化设计方法的适用性,为其他矿井的采充工艺协调优化的设计提供了参考。
        Aiming at the technical difficulties existed in the coordinated work of longwall-roadway with cemented backfilling technology,through the theoretical analysis and practical experience,the calculation formulas of the key parameters were derived in the mining and filling process,such as the number of roadways between two mining roadways,the number of simultaneous filling roadways and the number of mining and filling roadways in a cycle.Finally,a design method for coordinated optimization for mining and filling process of longwall-roadway with cemented backfilling technology was proposed.And it provided a theoretical support for improving the production efficiency of filling work surface and guiding the on-site practice.Based on the engineering background of Jinniu Coal Mine in Shaanxi Province,the implementation of the optimized design method was further explained,which proved the applicability of design method of the coordinated optimization for mining and filling process of longwall-roadway with cemented backfilling technology,and provided a reference for other mines.
引文
[1]谢和平,王金华,申宝宏,等.煤炭开采新理念---科学开采与科学产能[J].煤炭学报,2012,37(7):1069-1079.
    [2]钱鸣高.煤炭的科学开采[J].煤炭学报,2010,35(4):529-534.
    [3]张吉雄,缪协兴,郭广礼.矸石(固体废物)直接充填采煤技术发展现状[J].采矿与安全工程学报,2009,26(4):395-401.
    [4]王家臣,刘峰,王蕾.煤炭科学开采与开采科学[J].煤炭学报,2016,41(11):2651-2660.
    [5]张吉雄,缪协兴.煤矿矸石井下处理的研究[J].中国矿业大学学报,2006,35(2):197-200.
    [6]邓雪杰,张吉雄,周楠,等.特厚煤层长壁式胶结充填开采技术研究与应用[J].采矿与安全工程学报,2014,31(6):857-862.
    [7]孙强,张吉雄,殷伟,等.长壁机械化掘充填采煤围岩结构稳定性及运移规律[J].煤炭学报,2017,42(2):404-412.
    [8]杨宝贵,韩玉明,杨鹏飞,等.煤矿高浓度胶结充填材料配比研究[J].煤炭科学技术,2014,42(1):30.
    [9]樊海艳,郭忠平,黄万朋,等.矸石胶结充填体力学性能实验研究[J].煤矿开采,2015(6):83-86.
    [10]邹勇,徐国元,谭政.胶结充填体的力学性能研究[J].西部探矿工程,2007,19(4):88-90.
    [11]邓代强,姚中亮,唐绍辉,等.粒度组成对胶结充填体力学性能的影响[J].矿业研究与开发,2010,30(4):1-2.