摘要
苏州某超高层项目是典型的临近轨道超深基坑工程,保护要求提高。为更好地保护地铁,首次采用了后加分隔墙分坑施工方案。主要介绍了在基坑在后加分隔墙分坑施工过程中的难点、关键技术及主要解决措施。
A super high-rise project in Suzhou is a typical near track super deep foundation pit project,and its protection requirements are improved. In order to protect the subway better,the construction scheme of pit separation with rear partition wall is adopted for the first time. This paper mainly introduces the difficulties, key technologies and main solutions in the construction process of the foundation excavation with additional partition wall.
引文
[1]贾坚.软土时空效应原理在基坑工程中的应用[J].地下空间与工程学报,2005,1(4):490-493.
[2]杨艳超,郑吉成,郑世超,等.软土地区大型深基坑内支撑综合施工技术[J].施工技术,2017,46(17):118-120.
[3]王美华.“空间效应”在紧邻地铁深基坑工程中的应用[J].岩土工程学报,2008,30(S1):629-633.
[4]陈刚,邢澄.软土区域超深基坑连接段施工关键技术[J].施工技术,2018,47(1):15-18,23.
[5]刘国彬,王卫东.基坑工程手册[M]. 2版.北京:中国建筑工业出版社,2009.
[6]贾坚,谢小林,罗发扬,等.控制深基坑变形的支撑轴力伺服系统[J].上海交通大学学报,2009,43(10):1589-1594.