摘要
本文针对背靠背(BTB)启动机组时损毁一次电气设备的问题,对背靠背启动过程进行技术改造,提出相应的技术改造方案,并对改造方案进行说明。
In this paper,for the problem of damage to the primary electrical equipment during the back-to-back start-up of the unit,the back-to-back starting process is technically modified,and the corresponding technical transformation plan is proposed,and the transformation plan is explained.
引文
[1]王其平.电器中的电弧理论[M].上海:上海科学技术出版社,1983.
[2]操俊磊,张吉刚.仙居抽水蓄能电站计算机监控系统设计[J].水电厂自动化,2017.
[3]骆林,马志云.抽水蓄能电动发电机机组背靠背启动过程仿真研究[J].大电机技术,2005(6):11-14.
[4]清华大学高压教研组.高压断路器[M].北京:水利电力出版社,1978.
[5]王仁祥.电力新技术概论[M].北京:中国电力出版社,2009.