摘要
结合某高速公路大跨度斜拉桥工程实例,介绍了该箱-桁结合梁斜拉桥的施工重难点,分析了该工程的拼装误差,结合施工特点及难点,提出解决方案,以期提升大跨度桥梁的施工水平。
Combining with the engineering project of a long-span cable-stayed bridge of an expressway, the key and difficult points in the construction of the cable-stayed bridge with box-truss composite girder are introduced, the assembly errors of the project are analyzed, and the solutions are put forward in combination with the construction characteristics and difficulties, so as to improve the construction level of the long-span bridge.