摘要
Along the Lake-ring Road in Wushan County,Chongqing,there are very complicated geological conditions,which goes through ten or more geological hazards.Where the Lake-ring Road goes through the Starch Factory landslide area,the road is mainly constructed by sub-cutting and sub-filling methods.By recalculation of the stability influence on the Starch Factory landslide,the original design is considered not to meet the requirements,and it needs redesigning.The redesigned plan could ensure the construction safety.